RECORD OF AIP SUPPLEMENTS
The following table shows the AIP supplements in force on the publication date of the present amendment and those which have been cancelled respect to the previous amendment record.
NR/YEAR | SUBJECT | SECTION AFFECTED | PERIOD OF VALIDITY | CANCELLATION RECORD |
---|---|---|---|---|
152/20 | FIR MADRID.- Transit Corridor established. | ENR | 31DEC20/31DEC21EST | |
70/22 | SABADELL AD (LELL).- Cranes installed in the vicinity of the airport. | AD | 19MAY22/22APR23EST | From 09/06/2025 cancelled by NOTAM B4278/25 |
91/22 | FIR MADRID.- Antonio Valverde Wind Farm under construction. | ENR | 14JUL22/14JUL23EST | |
117/22 | FIR MADRID.- Wind farm Polux under construction. | ENR | 08SEP22/08SEP23EST | |
193/22 | MÁLAGA/Costa del Sol AD (LEMG).- Construction of two housing towers and installation of four cranes in the vicinity of the airport. | AD | 26JAN23/26JAN24EST | From 17/06/2025 cancelled by NOTAM A4057/25 |
14/23 | FIR MADRID.- Buniel Wind Farm under construction. | ENR | 23FEB23/23FEB24EST | |
17/23 | PALMA DE MALLORCA AD (LEPA/LESJ).- Aircraft rescue military crane out of service. | AD | 23FEB23/23FEB24EST | |
63/23 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Several actions on the airfield. | AD | 18MAY23/18MAY24EST | From 11/06/2025 cancelled by NOTAM B4366/25 |
74/23 | FIR MADRID.- Valdehierro Wind Farm under construction. | ENR | 15JUN23/15JUN24EST | |
106/23 | FIR BARCELONA.- San Isidro II Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | From 07/08/2025 cancelled by AIRAC 07/25 |
109/23 | FIR MADRID.- San Isidro Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | |
177/23 | FIR MADRID.- Canteras I Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
178/23 | FIR MADRID.- Canteras II Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | |
193/23 | FIR MADRID.- Las Atalayas Wind Farm under construction. | ENR | 28DEC23/28DEC24EST | |
08/24 | MURCIA/San Javier AD (LELC).- Floodlighting poles obstacles lights in civil and military aprons out of service. | AD | 25JAN24/25JAN25EST | |
36/24 | FIR MADRID.- El Campillo Wind Farm under construction. | ENR | 18APR24/18APR25EST | |
42/24 | FIR MADRID.- Installation of wind turbines and measurement towers at La Cernégula Wind Farm. | ENR | 18APR24/18APR25EST | |
43/24 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Secondary power supply. | AD | 21MAR24/21MAR25EST | From 19/06/2025 cancelled by NOTAM B4612/25 |
59/24 | VALENCIA AD (LEVC).- Perpendicular slope compliance works on levelled strip. | AD | 18APR24/18APR25EST | |
63/24 | FIR MADRID.- Jubera Wind Farm under construction. | ENR | 16MAY24/16MAY25EST | |
76/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- New standard instrument departures RNAV1 for RWY 24L. | AD | 13JUN24/13MAR25EST | From 10/07/2025 cancelled by SUP 128/25 |
77/24 | CASTEJÓN DE LOS MONEGROS AD RESTRINGIDO (LECJ).- Temporary closure. | AD | 16MAY24/16MAY25EST | From 07/08/2025 cancelled by AIRAC 07/25 |
80/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 16MAY24/16MAY25EST | |
86/24 | ZARAGOZA AD (LEZG).- Crane installed in the vicinity of the airport. | AD | 16MAY24/16MAY25EST | From 10/07/2025 cancelled by SUP 131/25 |
95/24 | FIR MADRID.- Wind turbines and one meteorological tower of Encina Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | |
97/24 | FIR MADRID.- Torrecilla Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | |
104/24 | FIR MADRID.- Acibal Wind Farm under construction. | ENR | 13JUN24/13JUN25EST | From 26/06/2025 cancelled by NOTAM B4833/25 |
105/24 | ALGECIRAS HLP (LEAG).- El Patrón Wind Farm under construction. | ENR/AD | 11JUL24/11JUL25EST | From 07/08/2025 cancelled by AIRAC 07/25 |
107/24 | FIR MADRID.- Cerrato VI Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
108/24 | FIR MADRID.- Installation of meteorological towers at Cerrato VI Wind Farm. | ENR | 11JUL24/11JUL25EST | |
109/24 | FIR MADRID.- Cerro Cabello Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | From 07/08/2025 cancelled by AIRAC 07/25 |
110/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II. | AD | 13JUN24/26JAN25EST | |
113/24 | FIR MADRID.- Airas Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
118/24 | FIR BARCELONA.- San Roque Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
119/24 | REUS AD (LERS).- Crane installed inside ATZ REUS. | AD | 11JUL24/11JUL25EST | From 03/06/2025 cancelled by NOTAM B4166/25 |
120/24 | FIR BARCELONA.- La Paul Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
122/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Restrictions to ILS STA RWY 29. | AD | 08AUG24/08AUG25EST | From 07/08/2025 cancelled by AIRAC 07/25 |
123/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 11JUL24/11JUL25EST | |
124/24 | FIR MADRID.- Jubera II Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
128/24 | A CORUÑA AD (LECO).- MSG crane installed in the vicinity of the airport. | AD | 08AUG24/08AUG25EST | |
130/24 | REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7. | AD | 05SEP24/05SEP25EST | |
131/24 | FIR MADRID.- Santos de la Piedra Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
132/24 | BILBAO AD (LEBB).- Remodelling of markings apron. | AD | 05SEP24/05SEP25EST | From 04/09/2025 cancelled by SUP 138/25 |
135/24 | FIR BARCELONA.- Erection of tower cranes. | ENR | 08AUG24/08AUG25EST | |
137/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Pavement renewal and compliance for TWY E and D. | AD | 05SEP24/05SEP25EST | |
140/24 | FIR MADRID.- Installation of a wind measuring tower within Farelo Wind Farm. | ENR | 08AUG24/08AUG25EST | |
142/24 | VALLADOLID/Villanubla AD (LEVD).- RWY 14/32 width reduced. | AD | 05SEP24/05SEP25EST | |
143/24 | FUERTEVENTURA AD (GCFV).- Restriction to DME FUE. | AD | 03OCT24/03OCT25EST | From 07/08/2025 cancelled by AIRAC 07/25 |
147/24 | FIR MADRID.- Dama de Baza wind farm under construction. | ENR | 03OCT24/03OCT25EST | |
148/24 | ZARAGOZA AD (LEZG).- Communications failure circuit not available (VAC 1). | AD | 05SEP24/05SEP25EST | |
149/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY CN lights out of service. | AD | 05SEP24/05SEP25EST | From 20/06/2025 cancelled by NOTAM A4174/25 |
150/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY M7-M6 lights out of service. | AD | 05SEP24/05SEP25EST | From 11/06/2025 cancelled by NOTAM A3944/25 |
153/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Declared Distances. | AD | 05SEP24/05SEP25EST | |
155/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works for apron lighting. | AD | 05SEP24/31OCT25EST | |
157/24 | AIS-ESPAÑA.- RPAS flights in the Gulf of Cadiz by Nordic Unmanned. | ENR | 03OCT24/03OCT25EST | From 16/07/2025 cancelled by NOTAM D2916/25 |
158/24 | FIR MADRID.- Aciberos Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | |
159/24 | FIR MADRID.- Padornelo 3 Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | |
160/24 | ZARAGOZA AD (LEZG).- Works for drainage adaptation at the manoeuvring area. | AD | 03OCT24/23FEB25EST | |
161/24 | FIR CANARIAS.- Instalation of Finca San Juan Wind Farm. | ENR | 03OCT24/03OCT25EST | |
162/24 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Temporary unavailability of DVOR/DME LRO. | AD | 03OCT24/13JUL25EST | From 10/07/2025 cancelled by NOTAM E3207/25 |
163/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Actions on taxiways associated with RWY 14R/32L. | AD | 05SEP24/05SEP25EST | |
164/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system. | AD | 03OCT24/03OCT25EST | |
165/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- 50 per cent CL TWY L9-L14 lights out of service. | AD | 31OCT24/31OCT25EST | From 20/06/2025 cancelled by NOTAM A4173/25 |
168/24 | FIR BARCELONA.- Santa Cruz IV Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
169/24 | HUESCA/Pirineos AD (LEHC).- PRKG 1 availability. | AD | 03OCT24/07SEP25EST | |
170/24 | PAMPLONA AD (LEPP).- Restrictions to VOR PPN. | AD | 31OCT24/31OCT25EST | |
173/24 | FIR BARCELONA.- Mareas I Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
176/24 | SAN SEBASTIÁN (LESO).- Crane installed in the vicinity of the airport. | AD | 03OCT24/30MAY25EST | |
177/24 | FIR MADRID.- Jerez Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
178/24 | FIR MADRID.- San Marcos II Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
179/24 | CASTELLÓN AD (LECH).- Temporary modification of the operational hours for public use of the aerodrome and of the rescue and fire fighting services for public use. | AD | 28NOV24/29MAR25EST | From 03/06/2025 cancelled by NOTAM B4168/25 |
181/24 | PALMA DE MALLORCA AD (LEPA/LESJ).- Extension works of module D. | AD | 28NOV24/28NOV25EST | |
185/24 | BILBAO AD (LEBB).- Compliance works for apron lighting. | AD | 28NOV24/28NOV25EST | |
186/24 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- TWY F4 and the section of TWY F3 between PRKG 258 and TWY F4 will remain closed. | AD | 31OCT24/31OCT25EST | |
187/24 | PALMA DE MALLORCA AD (LEPA/LESJ).- Works to expand Module A and remodel the Terminal and reconfigure aircraft stands in front of the new RFFS North. | AD | 28NOV24/28NOV25EST | |
188/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
189/24 | MENORCA AD (LEMH).- Pavement works on the apron. | AD | 28NOV24/28NOV25EST | |
190/24 | MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
191/24 | MENORCA AD (LEMH).- Works on the general aviation apron. | AD | 28NOV24/28NOV25EST | |
192/24 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to GP and DME IAT RWY 10. | AD | 28NOV24/28NOV25EST | |
193/24 | FIR MADRID.- La Ese wind farm under construction. | ENR | 26DEC24/26DEC25EST | |
194/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
197/24 | VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable. | AD | 28NOV24/28NOV25EST | |
199/24 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2. | AD | 26DEC24/26DEC25EST | |
200/24 | FIR MADRID.- Mondigo Wind Farm under construction. | ENR | 26DEC24/26DEC25EST | |
201/24 | AIS-ESPAÑA.- Temporary suspension of RNP APCH manoeuvres to published LPV minima at airports in the Canary Islands. | ENR/AD | 26DEC24/26DEC25EST | |
202/24 | FIR MADRID.- Rueda Sur Wind 1 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
203/24 | SABADELL AD (LELL).- PRKG 320 and 321 may only be used as stop and star-up areas for fixed-wing aircraft. | AD | 23JAN25/23JAN26EST | |
204/24 | FIR MADRID.- Installation of a measuring tower within Wind Farm Paldejas. | ENR | 23JAN25/23JAN26EST | |
205/24 | CASTELLÓN AD (LECH).- Aircraft stand closed. | AD | 26DEC24/26DEC25EST | |
206/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Modification of the OCA/H Table for the ILS Z and ILS Y approaches to RWY 17. | AD | 26DEC24/26DEC25EST | |
207/24 | FIR BARCELONA.- Les Colladetes wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
208/24 | FIR BARCELONA.- Les Colladetes Ampliación wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
210/24 | FIR MADRID.- Rueda Sur Wind 3 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
211/24 | FIR MADRID.- Rueda Sur Wind 2 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
212/24 | FIR MADRID.- Aldeavieja Repotenciación Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
01/25 | FIR MADRID.- La Mota Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
02/25 | FIR MADRID.- Installation of a measuring tower Los Caños II. | ENR | 20FEB25/20FEB26EST | |
03/25 | FIR MADRID.- Installation of a measuring tower EL HITO. | ENR | 20FEB25/20FEB26EST | |
07/25 | IBIZA AD (LEIB).- TWY EH closed. | AD | 23JAN25/23JAN26EST | |
08/25 | FIR MADRID.- Meteorological tower under construction at wind farm Luceros. | ENR | 20FEB25/20FEB26EST | |
10/25 | FIR MADRID.- Monte Becerril Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
12/25 | FIR MADRID.- Installation of a measuring tower within El Coto Wind Farm. | ENR | 20FEB25/20FEB26EST | |
13/25 | FIR MADRID.- Salguero Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
14/25 | ALBACETE AD (LEAB).- Modification of the civil aircraft apron configuration. | AD | 20FEB25/20FEB26EST | |
15/25 | ZARAGOZA AD (LEZG).- Aerodrome with operational limitations. | AD | 23JAN25/23JAN26EST | |
16/25 | FIR MADRID.- Miravete Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
17/25 | BURGOS/Villafría AD (LEBG).- Installation of a measuring tower within La Laguna Wind Farm. | ENR/AD | 20FEB25/20FEB26EST | |
18/25 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC/4 TACAN Z RWY 12R not usable. | AD | 20MAR25/20MAR26EST | |
19/25 | ANDORRA-LA SEU D’URGELL AD (LESU).- Modification to operational hours for restricted use of the aerodrome. | AD | 31MAR25/16SEP25 | |
20/25 | REUS AD (LERS).- Works to adapt the lighting systems to the new technologies and regulations. | AD | 20MAR25/20MAR26EST | |
21/25 | BILBAO AD (LEBB).- Replacement of runway edge lights and guard lights of RWY 10/28. | AD | 20FEB25/20FEB26EST | From 29/05/2025 cancelled by NOTAM B4004/25 |
22/25 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- Works to replace ILS/DME RWY 03 IRR. | AD | 20MAR25/20MAR26EST | |
23/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on TWY BY12. | AD | 20MAR25/20MAR26EST | |
24/25 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 20MAR25/20MAR26EST | |
25/25 | FIR MADRID.- Las Lomas measuring tower installation. | ENR | 20MAR25/20MAR26EST | |
26/25 | FIR MADRID.- Tahivilla-Tarifa Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
27/25 | MENORCA AD (LEMH).- Renovation of the engine generator control system. | AD | 20MAR25/20MAR26EST | |
29/25 | FIR BARCELONA.- Installation of a measuring tower within Santa Patricia Wind Farm. | ENR | 20MAR25/20MAR26EST | |
30/25 | FIR MADRID.- Wind turbines of the Cavadilla Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
31/25 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to VOR ALT and associated procedures. | ENR/AD | 20FEB25/20FEB26EST | |
32/25 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC 12 TACAN Z RWY 30R from IAF YARZU not usable. | AD | 20MAR25/20MAR26EST | |
33/25 | FUERTEVENTURA AD (GCFV).- Airfield compliance works. | AD | 20MAR25/20MAR26EST | |
34/25 | GRAN CANARIA AD (GCLP).- Restrictions in the manoeuvring area. | AD | 20MAR25/20MAR26EST | |
35/25 | SALAMANCA/Matacán AD (LESA).- Caution with ILS GP RWY 21. | AD | 20MAR25/20MAR26EST | |
36/25 | SALAMANCA/Matacán AD (LESA).- RWY 08/26 closed. | AD | 20MAR25/20MAR26EST | From 04/09/2025 cancelled by SUP 163/25 |
38/25 | FIR BARCELONA.- Concejo I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
39/25 | FIR BARCELONA.- La Vacada IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
40/25 | AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation. | ENR | 20MAR25/20MAR26EST | |
41/25 | FIR BARCELONA.- La Estrella II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
42/25 | FIR BARCELONA.- Vacada VI Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
43/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Modification to the OCA/H Table of the RNP Y approach manoeuvre to RWY 11. | AD | 20MAR25/20MAR26EST | From 10/07/2025 cancelled by SUP 121/25 |
45/25 | FIR MADRID.- Installation of a measuring tower within Monte Becerril Wind Farm. | ENR | 17APR25/17APR26EST | |
48/25 | REUS AD (LERS).- Vessel crane installed in the vicinity of the airport. | AD | 20MAR25/20MAR26EST | |
49/25 | FIR BARCELONA.- Concejo II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
50/25 | CIUDAD REAL AD (LERL).- Closure of TWY E2 and TWY T between GATE B and TWY E3. | AD | 20MAR25/20MAR26EST | |
52/25 | FIR BARCELONA.- Concejo III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
53/25 | FIR BARCELONA.- La Estrella IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
54/25 | ZARAGOZA AD (LEZG).- Wind turbines of the Repotenciación Muel Wind Farm under construction. | ENR/AD | 17APR25/17APR26EST | |
57/25 | FIR BARCELONA.- El Cabecero II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
58/25 | FIR BARCELONA.- Cid II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
59/25 | FIR BARCELONA.- Cid III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
60/25 | FIR BARCELONA.- Vacada I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
61/25 | FIR BARCELONA.- Cabecero III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
62/25 | FIR BARCELONA.- Cid I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
63/25 | FIR BARCELONA.- El Cabecero IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
64/25 | FIR BARCELONA.- La Estrella I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
65/25 | FIR BARCELONA.- La Vacada III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
66/25 | FIR BARCELONA.- Cid IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
67/25 | FIR BARCELONA.- La Vacada II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
68/25 | FIR BARCELONA.- La Estrella III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
69/25 | FIR MADRID.- Blanco Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
71/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Reconfiguration of Ramp 0. | AD | 15MAY25/15MAY26EST | |
73/25 | CASTELLÓN AD (LECH).- Temporary modification of the operational hours for public use of the aerodrome and of the rescue and fire fighting services for public use. | AD | 15MAY25/25OCT25 | |
74/25 | FIR MADRID.- La Colina Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
75/25 | FIR MADRID.- Possible limited radio VHF/UHF coverage in the northeastern part of the area of responsibility ECAO SEVILLA. | ENR | 17APR25/17APR26EST | |
76/25 | SANTIAGO/Rosalía de Castro AD (LEST).- RWY 35 approach lighting system (ALS) switched on in provisional configuration. | AD | 17APR25/17APR26EST | |
77/25 | FIR MADRID.- Arce Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
78/25 | FIR MADRID.- Los Balazos Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
80/25 | FIR BARCELONA.- Installation of a measuring tower within Les Cretes. | ENR | 15MAY25/15MAY26EST | From 30/06/2025 cancelled by NOTAM B4921/25 |
81/25 | FIR MADRID.- Parrancanas Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
82/25 | SAN SEBASTIÁN AD (LESO).- Cranes installed in the vicinity of the airport. | AD | 17APR25/17APR26EST | |
83/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Manoeuvres for entering and exiting PRKG A6, A7 and A8. | AD | 17APR25/17APR26EST | |
84/25 | FIR BARCELONA.- Vacada V Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
85/25 | FIR BARCELONA.- Mareas II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
86/25 | FIR MADRID.- Melguizas Wind Farm under contruction. | ENR | 15MAY25/15MAY26EST | |
87/25 | ASTURIAS AD (LEAS).- 50 per cent of TWY B center line lighting system unserviceable. | AD | 17APR25/17APR26EST | |
88/25 | GRAN CANARIA AD (GCLP).- Works at the access points to the thresholds of RWY 03L and 03R. | AD | 17APR25/17APR26EST | |
89/25 | FIR MADRID.- Carricondo Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
90/25 | FIR MADRID.- Plasencia Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
91/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23. | AD | 15MAY25/15MAY26EST | From 07/08/2025 cancelled by SUP 133/25 |
92/25 | PAMPLONA AD (LEPP).- Works to extend strip. | AD | 15MAY25/15MAY26EST | |
93/25 | FIR MADRID.- Installation of a measuring tower within Wind Farm La Arenica. | ENR | 12JUN25/12JUN26EST | |
94/25 | AIS ESPAÑA.- Recommendation to flights over Afghanistan. | ENR | 15MAY25/15MAY26EST | |
95/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Surface renovation and compliance on TWY S, T and Ramp 2 slabs. | AD | 12JUN25/12JUN26EST | |
96/25 | FIR MADRID.- Espilo Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
97/25 | FIR MADRID.- A Ruña II Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
98/25 | ZARAGOZA AD (LEZG).- RPAS operations. | AD | 15MAY25/15MAY26EST | |
100/25 | LOGROÑO AD (LERJ).- Caution when taxiing by TWY A. | AD | 15MAY25/15MAY26EST | |
101/25 | FIR MADRID.- Isabela Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
102/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Taxiing restrictions to aircraft code letter F on TWY Q9, Q10 and Q11. | AD | 15MAY25/15MAY26EST | |
104/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Installation of tower cranes in El Prat de Llobregat and impact on the ILS Z RWY 06L manoeuvre. | AD | 15MAY25/15MAY26EST | |
105/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on TWY W6. | AD | 12JUN25/12JUN26EST | |
106/25 | PAMPLONA AD (LEPP).- Works to replace ILS/DME RWY 15 IPN. | AD | 12JUN25/12JUN26EST | |
107/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL)..- Cranes installed in the vicinity of the airport. | AD | 15MAY25/15MAY26EST | |
108/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL)..- APAPI FATO 09 out of service. | AD | 15MAY25/15MAY26EST | |
109/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on Taxiways A17 and A20 until A24. | AD | 15MAY25/15MAY26EST | |
110/25 | VIGO AD (LEVX).- Change of lighting systems to LED technology. | AD | 12JUN25/12JUN26EST | |
111/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- New Ramp 24 and associated taxiways. | AD | 12JUN25/12JUN26EST | |
112/25 | GIRONA AD (LEGE).- Works to replace ILS/DME RWY 19 IGN. | AD | 12JUN25/12JUN26EST | |
113/25 | FIR MADRID.- Molar del Molinar Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
114/25 | SAN SEBASTIÁN AD (LESO).- Additional schedule for Fire Category 7. | AD | 12JUN25/12JUN26EST | |
115/25 | ZARAGOZA AD (LEZG).- Availability of facilities and services. | AD | 12JUN25/18APR26EST | |
116/25 | MADRID/Getafe AD (LEGT).- AZIMUT TACAN out of service. | AD | 12JUN25/12JUN26EST | |
117/25 | FIR MADRID.- Parque Eólico Iglesias en construcción. | ENR | 12JUN25/05OCT25EST | |
118/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Demolition of regulator chambers – Ramp 0. | AD | 10JUL25/10JUL26EST | From 10/07/2025 cancelled by SUP 134/25 |
119/25 | TREBUJENA AD RESTRINGIDO (LETJ).- Temporary closure. | AD | 10JUL25/10JUL26EST | |
120/25 | FIR MADRID.- La Mudarra Norte Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
121/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Modification to the OCA/H Table of the RNP Y approach manoeuvre to RWY 11. | AD | 10JUL25/10JUL26EST | |
122/25 | ASTURIAS AD (LEAS).- Unmanned aircraft flight areas. | AD | 12JUN25/12JUN26EST | |
123/25 | MADRID/Getafe AD (LEGT).- Tower cranes installed in the vicinity of the airport. | AD | 10JUL25/10JUL26EST | |
124/25 | LOGROÑO AD (LERJ).- TWR signal lamp out of service. | AD | 12JUN25/12JUN26EST | |
125/25 | CIUDAD REAL AD (LERL).- AFIS not available, IFR/VFR traffic not allowed. | AD | 12JUN25/12JUN26EST | From 07/08/2025 cancelled by AIRAC 07/25 |
126/25 | FIR MADRID.- Repotenciación Montes de Cierzo II Wind Farm under construction. | ENR | 07AUG25/07AUG26EST | |
127/25 | FIR MADRID.- Repotenciación Montes de Cierzo Wind Farm under construction. | ENR | 07AUG25/07AUG26EST | |
128/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- New standard instrument departures RNAV1 for RWY 24L. | AD | 10JUL25/10JUL26EST | |
129/25 | FIR MADRID.- Installation of a meteorological tower at Linte II Wind Farm. | ENR | 07AUG25/07AUG26EST | |
130/25 | SANTANDER/Seve Ballesteros-Santander (LEXJ).- Cranes installed at the port. | AD | 10JUL25/10JUL26EST | |
131/25 | ZARAGOZA AD (LEZG).- Crane installed in the vicinity of the airport. | AD | 10JUL25/16MAY26EST | |
132/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Modification to the OCA/H table in ILS Z and ILS Y to RWY 24L procedures. | AD | 10JUL25/10JUL26EST | |
133/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23. | AD | 07AUG25/07AUG26EST | |
134/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Demolition of the regulators chamber – Ramp 0. | AD | 10JUL25/10JUL26EST | |
135/25 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Replacement works of the ILS/DME RWY 30 ITF. | AD | 07AUG25/07AUG26EST | |
136/25 | AIS-ESPAÑA.- European Tactical Airlift Program Course 25-3 (ETAP-C 25-3). | ENR/AD | 08SEP25/18SEP25 | |
137/25 | SAN SEBASTIÁN AD (LESO).- Scheduled withdrawal of DVOR/DME BTZ. | AD | 07AUG25/07AUG26EST | |
138/25 | BILBAO AD (LEBB).-.- Remodelling of markings apron. | AD | 04SEP25/04SEP26EST | |
139/25 | AIS-ESPAÑA.- DÍA DE LA FIESTA NACIONAL 2025 air parade. | ENR/AD | 29SEP25/12OCT25 | |
140/25 | FIR MADRID.- La Senda and El Camino Wind Farms under construction. | ENR | 04SEP25/04SEP26EST | |
141/25 | MADRID/Getafe AD (LEGT).- Cranes installed in the vicinity of the airport. | AD | 07AUG25/07AUG26EST | |
142/25 | VIGO AD (LEVX).- Provision of the aerodrome AIS/ARO services. | AD | 07AUG25/07AUG26EST | |
143/25 | IBIZA AD (LEIB).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
144/25 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
145/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Secondary power supply. | AD | 07AUG25/07AUG26EST | |
146/25 | LANZAROTE/César Manrique Lanzarote (GCRR).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
147/25 | BILBAO AD (LEBB).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
148/25 | BILBAO AD (LEBB).- Works on air TWY D4 and helicopter apron. | AD | 04SEP25/04SEP26EST | |
149/25 | A CORUÑA AD (LECO).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
150/25 | JEREZ AD (LEJR).- PRKG H9 closed. | AD | 07AUG25/07AUG26EST | |
151/25 | HUESCA/Pirineos AD (LEHC).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
152/25 | MADRID/Getafe AD (LEGT).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
153/25 | AIS-ESPAÑA.- Temporary reserved area (TRA) for the celebration of the air festival Festa al Cel. | ENR/AD | 04SEP25/22SEP25 | |
154/25 | AIS-ESPAÑA.- Eagle Eye 25-03 exercise. | ENR | 15SEP25/19SEP25 | |
155/25 | SAN SEBASTIÁN AD (LESO).- Works to replace DME San Sebastián HIG. | AD | 04SEP25/04SEP26EST | |
156/25 | SANTIAGO/Rosalía de Castro (LEST).- Provision of the aerodrome AIS and ARO services. | AD | 07AUG25/07AUG26EST | |
157/25 | FIR MADRID.- Isar-Yudego Wind Farm under construction. | ENR | 04SEP25/04SEP26EST | |
158/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
159/25 | ZARAGOZA AD (LEZG).- Arresting system completely withdrawn. | AD | 07AUG25/07AUG26EST | |
160/25 | AIS-ESPAÑA.- ENR 1.10 Flight Plan filling from aerodromes and heliports lacking an ARO. | ENR | 07AUG25/07AUG26EST | |
161/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY B3, B4, Z3, BN1, N4 and N5. | AD | 04SEP25/04SEP26EST | |
162/25 | MADRID/Getafe AD (LEGT).- Installation of four self-propelled cranes and two fire trucks in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
163/25 | SALAMANCA/Matacán AD (LESA).- RWY 07/25 closed. | AD | 04SEP25/04SEP26EST |