AIP

ESPAÑA

GEN 0.3

27-NOV-2530-OCT-25

RECORD OF AIP SUPPLEMENTS

The following table shows the AIP supplements in force on the publication date of the present amendment and those which have been cancelled respect to the previous amendment record.

NR/YEAR

SUBJECT

SECTION AFFECTED

PERIOD OF VALIDITY

CANCELLATION RECORD

152/20

FIR MADRID.- Transit Corridor established.

ENR

31DEC20/31DEC21EST

91/22

FIR MADRID.- Antonio Valverde Wind Farm under construction.

ENR

14JUL22/14JUL23EST

117/22

FIR MADRID.- Wind farm Polux under construction.

ENR

08SEP22/08SEP23EST

From 25/12/2025 cancelled by AIRAC 13/25

14/23

FIR MADRID.- Buniel Wind Farm under construction.

ENR

23FEB23/23FEB24EST

From 25/12/2025 cancelled by AIRAC 13/25

17/23

PALMA DE MALLORCA AD (LEPA/LESJ).- Aircraft rescue military crane out of service.

AD

23FEB23/23FEB24EST

74/23

FIR MADRID.- Valdehierro Wind Farm under construction.

ENR

15JUN23/15JUN24EST

109/23

FIR MADRID.- San Isidro Wind Farm under construction.

ENR

10AUG23/10AUG24EST

177/23

FIR MADRID.- Canteras I Wind Farm under construction.

ENR

30NOV23/30NOV24EST

178/23

FIR MADRID.- Canteras II Wind Farm under construction.

ENR

30NOV23/30NOV24EST

From 25/12/2025 cancelled by AIRAC 13/25

193/23

FIR MADRID.- Las Atalayas Wind Farm under construction.

ENR

28DEC23/28DEC24EST

From 25/12/2025 cancelled by AIRAC 13/25

08/24

MURCIA/San Javier AD (LELC).- Floodlighting poles obstacles lights in civil and military aprons out of service.

AD

25JAN24/25JAN25EST

36/24

FIR MADRID.- El Campillo Wind Farm under construction.

ENR

18APR24/18APR25EST

From 25/12/2025 cancelled by AIRAC 13/25

42/24

FIR MADRID.- Installation of wind turbines and measurement towers at La Cernégula Wind Farm.

ENR

18APR24/18APR25EST

59/24

VALENCIA AD (LEVC).- Perpendicular slope compliance works on levelled strip.

AD

18APR24/18APR25EST

63/24

FIR MADRID.- Jubera Wind Farm under construction.

ENR

16MAY24/16MAY25EST

From 25/12/2025 cancelled by AIRAC 13/25

80/24

SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport.

AD

16MAY24/16MAY25EST

From 23/10/2025 cancelled by NOTAM B8051/25

95/24

FIR MADRID.- Wind turbines and one meteorological tower of Encina Wind Farm under construction.

ENR

13JUN24/13JUN25EST

From 30/10/2025 cancelled by AIRAC 11/25

97/24

FIR MADRID.- Torrecilla Wind Farm under construction.

ENR

13JUN24/13JUN25EST

From 30/10/2025 cancelled by AIRAC 11/25

107/24

FIR MADRID.- Cerrato VI Wind Farm under construction.

ENR

11JUL24/11JUL25EST

From 25/12/2025 cancelled by AIRAC 13/25

108/24

FIR MADRID.- Installation of meteorological towers at Cerrato VI Wind Farm.

ENR

11JUL24/11JUL25EST

From 25/12/2025 cancelled by AIRAC 13/25

110/24

TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II.

AD

13JUN24/26JAN25EST

113/24

FIR MADRID.- Airas Wind Farm under construction.

ENR

11JUL24/11JUL25EST

118/24

FIR BARCELONA.- San Roque Wind Farm under construction.

ENR

08AUG24/08AUG25EST

120/24

FIR BARCELONA.- La Paul Wind Farm under construction.

ENR

08AUG24/08AUG25EST

123/24

SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport.

AD

11JUL24/11JUL25EST

From 23/10/2025 cancelled by NOTAM B8050/25

124/24

FIR MADRID.- Jubera II Wind Farm under construction.

ENR

08AUG24/08AUG25EST

From 25/12/2025 cancelled by AIRAC 13/25

128/24

A CORUÑA AD (LECO).- MSG crane installed in the vicinity of the airport.

AD

08AUG24/08AUG25EST

From 19/09/2025 cancelled by NOTAM B7004/25

131/24

FIR MADRID.- Santos de la Piedra Wind Farm under construction.

ENR

08AUG24/08AUG25EST

From 30/10/2025 cancelled by AIRAC 11/25

137/24

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Pavement renewal and compliance for TWY E and D.

AD

05SEP24/05SEP25EST

From 19/09/2025 cancelled by NOTAM A6190/25

140/24

FIR MADRID.- Installation of a wind measuring tower within Farelo Wind Farm.

ENR

08AUG24/08AUG25EST

142/24

VALLADOLID/Villanubla AD (LEVD).- RWY 14/32 width reduced.

AD

05SEP24/05SEP25EST

147/24

FIR MADRID.- Dama de Baza wind farm under construction.

ENR

03OCT24/03OCT25EST

From 27/11/2025 cancelled by SUP 217/25

153/24

SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Declared Distances.

AD

05SEP24/05SEP25EST

155/24

SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works for apron lighting.

AD

05SEP24/31OCT25EST

158/24

FIR MADRID.- Aciberos Wind Farm under construction.

ENR

03OCT24/03OCT25EST

159/24

FIR MADRID.- Padornelo 3 Wind Farm under construction.

ENR

03OCT24/03OCT25EST

160/24

ZARAGOZA AD (LEZG).- Works for drainage adaptation at the manoeuvring area.

AD

03OCT24/23FEB25EST

161/24

FIR CANARIAS.- Instalation of Finca San Juan Wind Farm.

ENR

03OCT24/03OCT25EST

163/24

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Actions on taxiways associated with RWY 14R/32L.

AD

05SEP24/05SEP25EST

From 25/12/2025 cancelled by AIRAC 13/25

164/24

TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system.

AD

03OCT24/03OCT25EST

From 27/11/2025 cancelled by SUP 215/25

168/24

FIR BARCELONA.- Santa Cruz IV Wind Farm under construction.

ENR

31OCT24/31OCT25EST

From 30/10/2025 cancelled by AIRAC 11/25

169/24

HUESCA/Pirineos AD (LEHC).- PRKG 1 availability.

AD

03OCT24/07SEP25EST

173/24

FIR BARCELONA.- Mareas I Wind Farm under construction.

ENR

31OCT24/31OCT25EST

From 30/10/2025 cancelled by AIRAC 11/25

176/24

SAN SEBASTIÁN (LESO).- Crane installed in the vicinity of the airport.

AD

03OCT24/30MAY25EST

178/24

FIR MADRID.- San Marcos II Wind Farm under construction.

ENR

31OCT24/31OCT25EST

181/24

PALMA DE MALLORCA AD (LEPA/LESJ).- Extension works of module D.

AD

28NOV24/28NOV25EST

From 30/10/2025 cancelled by SUP 185/25

185/24

BILBAO AD (LEBB).- Compliance works for apron lighting.

AD

28NOV24/28NOV25EST

From 27/11/2025 cancelled by SUP 208/25

186/24

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- TWY F4 and the section of TWY F3 between PRKG 258 and TWY F4 will remain closed.

AD

31OCT24/31OCT25EST

From 30/10/2025 cancelled by SUP 192/25

187/24

PALMA DE MALLORCA AD (LEPA/LESJ).- Works to expand Module A and remodel the Terminal and reconfigure aircraft stands in front of the new RFFS North.

AD

28NOV24/28NOV25EST

From 30/10/2025 cancelled by SUP 180/25

188/24

SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport.

AD

28NOV24/28NOV25EST

190/24

MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport.

AD

28NOV24/28NOV25EST

From 27/11/2025 cancelled by SUP 207/25

192/24

ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to GP and DME IAT RWY 10.

AD

28NOV24/28NOV25EST

193/24

FIR MADRID.- La Ese wind farm under construction.

ENR

26DEC24/26DEC25EST

194/24

SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the vicinity of the airport.

AD

28NOV24/28NOV25EST

197/24

VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable.

AD

28NOV24/28NOV25EST

From 30/10/2025 cancelled by SUP 201/25

199/24

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2.

AD

26DEC24/26DEC25EST

From 27/11/2025 cancelled by SUP 214/25

200/24

FIR MADRID.- Mondigo Wind Farm under construction.

ENR

26DEC24/26DEC25EST

201/24

AIS-ESPAÑA.- Temporary suspension of RNP APCH manoeuvres to published LPV minima at airports in the Canary Islands.

ENR/AD

26DEC24/26DEC25EST

202/24

FIR MADRID.- Rueda Sur Wind 1 Wind Farm under construction.

ENR

23JAN25/23JAN26EST

203/24

SABADELL AD (LELL).- PRKG 320 and 321 may only be used as stop and star-up areas for fixed-wing aircraft.

AD

23JAN25/23JAN26EST

204/24

FIR MADRID.- Installation of a measuring tower within Wind Farm Paldejas.

ENR

23JAN25/23JAN26EST

From 31/10/2025 cancelled by NOTAM B8327/25

205/24

CASTELLÓN AD (LECH).- Aircraft stand closed.

AD

26DEC24/26DEC25EST

206/24

SANTIAGO/Rosalía de Castro AD (LEST).- Modification of the OCA/H Table for the ILS Z and ILS Y approaches to RWY 17.

AD

26DEC24/26DEC25EST

207/24

FIR BARCELONA.- Les Colladetes wind farm under construction.

ENR

23JAN25/23JAN26EST

208/24

FIR BARCELONA.- Les Colladetes Ampliación wind farm under construction.

ENR

23JAN25/23JAN26EST

210/24

FIR MADRID.- Rueda Sur Wind 3 Wind Farm under construction.

ENR

23JAN25/23JAN26EST

211/24

FIR MADRID.- Rueda Sur Wind 2 Wind Farm under construction.

ENR

23JAN25/23JAN26EST

212/24

FIR MADRID.- Aldeavieja Repotenciación Wind Farm under construction.

ENR

23JAN25/23JAN26EST

From 25/12/2025 cancelled by AIRAC 13/25

01/25

FIR MADRID.- La Mota Wind Farm under construction.

ENR

20FEB25/20FEB26EST

02/25

FIR MADRID.- Installation of a measuring tower Los Caños II.

ENR

20FEB25/20FEB26EST

03/25

FIR MADRID.- Installation of a measuring tower EL HITO.

ENR

20FEB25/20FEB26EST

07/25

IBIZA AD (LEIB).- TWY EH closed.

AD

23JAN25/23JAN26EST

08/25

FIR MADRID.- Meteorological tower under construction at wind farm Luceros.

ENR

20FEB25/20FEB26EST

From 25/12/2025 cancelled by AIRAC 13/25

10/25

FIR MADRID.- Monte Becerril Wind Farm under construction.

ENR

20FEB25/20FEB26EST

12/25

FIR MADRID.- Installation of a measuring tower within El Coto Wind Farm.

ENR

20FEB25/20FEB26EST

13/25

FIR MADRID.- Salguero Wind Farm under construction.

ENR

20FEB25/20FEB26EST

14/25

ALBACETE AD (LEAB).- Modification of the civil aircraft apron configuration.

AD

20FEB25/20FEB26EST

15/25

ZARAGOZA AD (LEZG).- Aerodrome with operational limitations.

AD

23JAN25/23JAN26EST

16/25

FIR MADRID.- Miravete Wind Farm under construction.

ENR

20MAR25/20MAR26EST

17/25

BURGOS/Villafría AD (LEBG).- Installation of a measuring tower within La Laguna Wind Farm.

ENR/AD

20FEB25/20FEB26EST

18/25

ZARAGOZA AD (LEZG).- Instrument approach chart IAC/4 TACAN Z RWY 12R not usable.

AD

20MAR25/20MAR26EST

20/25

REUS AD (LERS).- Works to adapt the lighting systems to the new technologies and regulations.

AD

20MAR25/20MAR26EST

22/25

LANZAROTE/César Manrique Lanzarote AD (GCRR).- Works to replace ILS/DME RWY 03 IRR.

AD

20MAR25/20MAR26EST

From 17/09/2025 cancelled by NOTAM E4232/25

24/25

MENORCA AD (LEMH).- Renewal of the runway edge lighting system.

AD

20MAR25/20MAR26EST

25/25

FIR MADRID.- Las Lomas measuring tower installation.

ENR

20MAR25/20MAR26EST

From 30/10/2025 cancelled by AIRAC 11/25

26/25

FIR MADRID.- Tahivilla-Tarifa Wind Farm under construction.

ENR

20MAR25/20MAR26EST

27/25

MENORCA AD (LEMH).- Renovation of the engine generator control system.

AD

20MAR25/20MAR26EST

29/25

FIR BARCELONA.- Installation of a measuring tower within Santa Patricia Wind Farm.

ENR

20MAR25/20MAR26EST

30/25

FIR MADRID.- Wind turbines of the Cavadilla Wind Farm under construction.

ENR

20MAR25/20MAR26EST

From 30/10/2025 cancelled by AIRAC 11/25

31/25

ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to VOR ALT and associated procedures.

ENR/AD

20FEB25/20FEB26EST

32/25

ZARAGOZA AD (LEZG).- Instrument approach chart IAC 12 TACAN Z RWY 30R from IAF YARZU not usable.

AD

20MAR25/20MAR26EST

From 27/11/2025 cancelled by SUP 219/25

33/25

FUERTEVENTURA AD (GCFV).- Airfield compliance works.

AD

20MAR25/20MAR26EST

34/25

GRAN CANARIA AD (GCLP).- Restrictions in the manoeuvring area.

AD

20MAR25/20MAR26EST

From 25/12/2025 cancelled by SUP 220/25

35/25

SALAMANCA/Matacán AD (LESA).- Caution with ILS GP RWY 21.

AD

20MAR25/20MAR26EST

38/25

FIR BARCELONA.- Concejo I Wind Farm under construction.

ENR

17APR25/17APR26EST

39/25

FIR BARCELONA.- La Vacada IV Wind Farm under construction.

ENR

17APR25/17APR26EST

40/25

AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation.

ENR

20MAR25/20MAR26EST

41/25

FIR BARCELONA.- La Estrella II Wind Farm under construction.

ENR

17APR25/17APR26EST

42/25

FIR BARCELONA.- Vacada VI Wind Farm under construction.

ENR

17APR25/17APR26EST

45/25

FIR MADRID.- Installation of a measuring tower within Monte Becerril Wind Farm.

ENR

17APR25/17APR26EST

48/25

REUS AD (LERS).- Vessel crane installed in the vicinity of the airport.

AD

20MAR25/20MAR26EST

49/25

FIR BARCELONA.- Concejo II Wind Farm under construction.

ENR

17APR25/17APR26EST

52/25

FIR BARCELONA.- Concejo III Wind Farm under construction.

ENR

17APR25/17APR26EST

53/25

FIR BARCELONA.- La Estrella IV Wind Farm under construction.

ENR

17APR25/17APR26EST

54/25

ZARAGOZA AD (LEZG).- Wind turbines of the Repotenciación Muel Wind Farm under construction.

ENR/AD

17APR25/17APR26EST

57/25

FIR BARCELONA.- El Cabecero II Wind Farm under construction.

ENR

17APR25/17APR26EST

58/25

FIR BARCELONA.- Cid II Wind Farm under construction.

ENR

17APR25/17APR26EST

59/25

FIR BARCELONA.- Cid III Wind Farm under construction.

ENR

17APR25/17APR26EST

60/25

FIR BARCELONA.- Vacada I Wind Farm under construction.

ENR

17APR25/17APR26EST

61/25

FIR BARCELONA.- Cabecero III Wind Farm under construction.

ENR

17APR25/17APR26EST

62/25

FIR BARCELONA.- Cid I Wind Farm under construction.

ENR

17APR25/17APR26EST

63/25

FIR BARCELONA.- El Cabecero IV Wind Farm under construction.

ENR

17APR25/17APR26EST

64/25

FIR BARCELONA.- La Estrella I Wind Farm under construction.

ENR

17APR25/17APR26EST

65/25

FIR BARCELONA.- La Vacada III Wind Farm under construction.

ENR

17APR25/17APR26EST

66/25

FIR BARCELONA.- Cid IV Wind Farm under construction.

ENR

17APR25/17APR26EST

67/25

FIR BARCELONA.- La Vacada II Wind Farm under construction.

ENR

17APR25/17APR26EST

68/25

FIR BARCELONA.- La Estrella III Wind Farm under construction.

ENR

17APR25/17APR26EST

69/25

FIR MADRID.- Blanco Wind Farm under construction.

ENR

15MAY25/15MAY26EST

71/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Reconfiguration of Ramp 0.

AD

15MAY25/15MAY26EST

74/25

FIR MADRID.- La Colina Wind Farm under construction.

ENR

15MAY25/15MAY26EST

75/25

FIR MADRID.- Possible limited radio VHF/UHF coverage in the northeastern part of the area of responsibility ECAO SEVILLA.

ENR

17APR25/17APR26EST

76/25

SANTIAGO/Rosalía de Castro AD (LEST).- RWY 35 approach lighting system (ALS) switched on in provisional configuration.

AD

17APR25/17APR26EST

77/25

FIR MADRID.- Arce Wind Farm under construction.

ENR

15MAY25/15MAY26EST

78/25

FIR MADRID.- Los Balazos Wind Farm under construction.

ENR

15MAY25/15MAY26EST

81/25

FIR MADRID.- Parrancanas Wind Farm under construction.

ENR

15MAY25/15MAY26EST

82/25

SAN SEBASTIÁN AD (LESO).- Cranes installed in the vicinity of the airport.

AD

17APR25/17APR26EST

83/25

SANTIAGO/Rosalía de Castro AD (LEST).- Manoeuvres for entering and exiting PRKG A6, A7 and A8.

AD

17APR25/17APR26EST

84/25

FIR BARCELONA.- Vacada V Wind Farm under construction.

ENR

15MAY25/15MAY26EST

85/25

FIR BARCELONA.- Mareas II Wind Farm under construction.

ENR

17APR25/17APR26EST

From 25/12/2025 cancelled by AIRAC 13/25

86/25

FIR MADRID.- Melguizas Wind Farm under contruction.

ENR

15MAY25/15MAY26EST

87/25

ASTURIAS AD (LEAS).- 50 per cent of TWY B center line lighting system unserviceable.

AD

17APR25/17APR26EST

88/25

GRAN CANARIA AD (GCLP).- Works at the access points to the thresholds of RWY 03L and 03R.

AD

17APR25/17APR26EST

From 25/12/2025 cancelled by AIRAC 13/25

89/25

FIR MADRID.- Carricondo Wind Farm under construction.

ENR

15MAY25/15MAY26EST

90/25

FIR MADRID.- Plasencia Wind Farm under construction.

ENR

15MAY25/15MAY26EST

92/25

PAMPLONA AD (LEPP).- Works to extend strip.

AD

15MAY25/15MAY26EST

93/25

FIR MADRID.- Installation of a measuring tower within Wind Farm La Arenica.

ENR

12JUN25/12JUN26EST

94/25

AIS ESPAÑA.- Recommendation to flights over Afghanistan.

ENR

15MAY25/15MAY26EST

95/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Surface renovation and compliance on TWY S, T and Ramp 2 slabs.

AD

12JUN25/12JUN26EST

96/25

FIR MADRID.- Espilo Wind Farm under construction.

ENR

12JUN25/12JUN26EST

97/25

FIR MADRID.- A Ruña II Wind Farm under construction.

ENR

15MAY25/15MAY26EST

98/25

ZARAGOZA AD (LEZG).- RPAS operations.

AD

15MAY25/15MAY26EST

100/25

LOGROÑO AD (LERJ).- Caution when taxiing by TWY A.

AD

15MAY25/15MAY26EST

101/25

FIR MADRID.- Isabela Wind Farm under construction.

ENR

12JUN25/12JUN26EST

102/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Taxiing restrictions to aircraft code letter F on TWY Q9, Q10 and Q11.

AD

15MAY25/15MAY26EST

104/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Installation of tower cranes in El Prat de Llobregat and impact on the ILS Z RWY 06L manoeuvre.

AD

15MAY25/15MAY26EST

105/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on TWY W6.

AD

12JUN25/12JUN26EST

106/25

PAMPLONA AD (LEPP).- Works to replace ILS/DME RWY 15 IPN.

AD

12JUN25/12JUN26EST

From 15/09/2025 cancelled by NOTAM E4186/25

107/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Cranes installed in the vicinity of the airport.

AD

15MAY25/15MAY26EST

108/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- APAPI FATO 09 out of service.

AD

15MAY25/15MAY26EST

109/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on Taxiways A17 and A20 until A24.

AD

15MAY25/15MAY26EST

110/25

VIGO AD (LEVX).- Change of lighting systems to LED technology.

AD

12JUN25/12JUN26EST

111/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- New Ramp 24 and associated taxiways.

AD

12JUN25/12JUN26EST

From 25/12/2025 cancelled by AIRAC 13/25

112/25

GIRONA AD (LEGE).- Works to replace ILS/DME RWY 19 IGN.

AD

12JUN25/12JUN26EST

From 15/09/2025 cancelled by NOTAM E4187/25

113/25

FIR MADRID.- Molar del Molinar Wind Farm under construction.

ENR

12JUN25/12JUN26EST

114/25

SAN SEBASTIÁN AD (LESO).- Additional schedule for Fire Category 7.

AD

12JUN25/12JUN26EST

115/25

ZARAGOZA AD (LEZG).- Availability of facilities and services.

AD

12JUN25/18APR26EST

116/25

MADRID/Getafe AD (LEGT).- AZIMUT TACAN out of service.

AD

12JUN25/12JUN26EST

117/25

FIR MADRID.- Iglesias Wind Farm under construction.

ENR

12JUN25/05OCT25EST

120/25

FIR MADRID.- La Mudarra Norte Wind Farm under construction.

ENR

12JUN25/12JUN26EST

121/25

SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Modification to the OCA/H Table of the RNP Y approach manoeuvre to RWY 11.

AD

10JUL25/10JUL26EST

122/25

ASTURIAS AD (LEAS).- Unmanned aircraft flight areas.

AD

12JUN25/12JUN26EST

123/25

MADRID/Getafe AD (LEGT).- Tower cranes installed in the vicinity of the airport.

AD

10JUL25/10JUL26EST

124/25

LOGROÑO AD (LERJ).- TWR signal lamp out of service.

AD

12JUN25/12JUN26EST

126/25

FIR MADRID.- Repotenciación Montes de Cierzo II Wind Farm under construction.

ENR

07AUG25/07AUG26EST

127/25

FIR MADRID.- Repotenciación Montes de Cierzo Wind Farm under construction.

ENR

07AUG25/07AUG26EST

128/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- New standard instrument departures RNAV1 for RWY 24L.

AD

10JUL25/10JUL26EST

129/25

FIR MADRID.- Installation of a meteorological tower at Linte II Wind Farm.

ENR

07AUG25/07AUG26EST

130/25

SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed at the port.

AD

10JUL25/10JUL26EST

131/25

ZARAGOZA AD (LEZG).- Crane installed in the vicinity of the airport.

AD

10JUL25/16MAY26EST

132/25

PALMA DE MALLORCA AD (LEPA/LESJ).- Modification to the OCA/H table in ILS Z and ILS Y to RWY 24L procedures.

AD

10JUL25/10JUL26EST

133/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23.

AD

07AUG25/07AUG26EST

134/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Demolition of the regulators chamber – Ramp 0.

AD

10JUL25/10JUL26EST

135/25

TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Replacement works of the ILS/DME RWY 30 ITF.

AD

07AUG25/07AUG26EST

137/25

SAN SEBASTIÁN AD (LESO).- Scheduled withdrawal of DVOR/DME BTZ.

AD

07AUG25/07AUG26EST

138/25

BILBAO AD (LEBB).- Remodelling of markings apron.

AD

04SEP25/04SEP26EST

From 30/10/2025 cancelled by SUP 202/25

140/25

FIR MADRID.- La Senda and El Camino Wind Farms under construction.

ENR

04SEP25/04SEP26EST

141/25

MADRID/Getafe AD (LEGT).- Cranes installed in the vicinity of the airport.

AD

07AUG25/07AUG26EST

142/25

VIGO AD (LEVX).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 21/10/2025 cancelled by NOTAM B7955/25

143/25

IBIZA AD (LEIB).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 07/10/2025 cancelled by NOTAM B7327/25

144/25

TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 14/10/2025 cancelled by NOTAM B7659/25

145/25

SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Secondary power supply.

AD

07AUG25/07AUG26EST

From 09/10/2025 cancelled by NOTAM B7524/25

146/25

LANZAROTE/César Manrique Lanzarote AD (GCRR).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 23/09/2025 cancelled by NOTAM B7068/25

147/25

BILBAO AD (LEBB).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 30/09/2025 cancelled by NOTAM B7127/25

148/25

BILBAO AD (LEBB).- Works on air TWY D4 and helicopter apron.

AD

04SEP25/04SEP26EST

149/25

A CORUÑA AD (LECO).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

150/25

JEREZ AD (LEJR).- PRKG H9 closed.

AD

07AUG25/07AUG26EST

151/25

HUESCA/Pirineos AD (LEHC).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 16/09/2025 cancelled by NOTAM B6716/25

152/25

MADRID/Getafe AD (LEGT).- Crane installed in the vicinity of the airport.

AD

04SEP25/04SEP26EST

155/25

SAN SEBASTIÁN AD (LESO).- Works to replace DME San Sebastián HIG.

AD

04SEP25/04SEP26EST

156/25

SANTIAGO/Rosalía de Castro AD (LEST).- Provision of the aerodrome AIS and ARO services.

AD

07AUG25/07AUG26EST

From 27/11/2025 cancelled by NOTAM A7285/25

157/25

FIR MADRID.- Isar-Yudego Wind Farm under construction.

ENR

04SEP25/04SEP26EST

158/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the airport.

AD

04SEP25/04SEP26EST

159/25

ZARAGOZA AD (LEZG).- Arresting system completely withdrawn.

AD

07AUG25/07AUG26EST

161/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on Taxiways B3, B4, Z3, BN1, N4 and N5.

AD

04SEP25/04SEP26EST

162/25

MADRID/Getafe AD (LEGT).- Installation of four self-propelled cranes and two fire trucks in the vicinity of the airport.

AD

04SEP25/04SEP26EST

163/25

SALAMANCA/Matacán AD (LESA).- RWY 07/25 closed.

AD

04SEP25/04SEP26EST

 

164/25

PAMPLONA AD (LEPP).- Restrictions to DVOR PPN.

AD

04SEP25/04SEP26EST

165/25

FIR MADRID.- Ubierna Wind Farm under construction.

ENR

02OCT25/02OCT26EST

166/25

TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Intermediate holding positions R1-R7 unserviceable.

AD

04SEP25/04SEP26EST

167/25

SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works on apron P1.

AD

02OCT25/02OCT26EST

168/25

BILBAO AD (LEBB).- Works for the dismantling and demolition of the old DVOR/DME BLV.

AD

02OCT25/02OCT26EST

169/25

REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7 and on TWY T0, T1 and T2.

AD

02OCT25/02OCT26EST

From 30/10/2025 cancelled by SUP 212/25

170/25

AIS-ESPAÑA.- OCEAN SKY 2025 exercise.

ENR

17OCT25/31OCT25

From 31/10/2025 cancelled by expiry date

171/25

LOGROÑO AD (LERJ).- Error in TORA board at RWY 29 INT A.

AD

02OCT25/02OCT26EST

From 30/10/2025 cancelled by SUP 211/25

172/25

REUS AD (LERS).- Restriction to LOC IRS.

AD

02OCT25/02OCT26EST

173/25

IBIZA AD (LEIB).- Repainting of commercial apron W25 LEIB.

AD

30OCT25/30OCT26EST

174/25

MURCIA/San Javier AD (LELC).- Downgraded category of military rescue and fire fighting services.

AD

02OCT25/02OCT26EST

175/25

PALMA DE MALORCA AD (LEPA/LESJ).- Scheduled withdrawal of DVOR/DME of Pollensa.

AD

30OCT25/30OCT26EST

176/25

ALBACETE AD (LEAB).- Risk of FOD on APN E-1.

AD

02OCT25/02OCT26EST

177/25

FUERTEVENTURA AD (GCFV).- Left wing of PAPI RWY 01 out of service.

AD

02OCT25/02OCT26EST

178/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Expansion of remote apron at T123 – Ramp 0. New PRKG 27 to 29.

AD

30OCT25/30OCT26EST

From 25/12/2025 cancelled by SUP 226/25

179/25

MENORCA AD (LEMH).- Upgrading of inspection chambers on the airfield.

AD

30OCT25/30OCT26EST

180/25

PALMA DE MALLORCA AD (LEPA/LESJ).- Works for the remodelling of Module A and the Terminal (West Zone).

AD

30OCT25/30OCT26EST

181/25

ZARAGOZA AD (LEZG).- Communications failure circuit not available (VAC 1).

AD

02OCT25/05SEP26EST

182/25

REUS AD (LERS).- Works to replace ILS/DME RWY 25 “IRS”.

AD

30OCT25/30OCT26EST

183/25

AIS-ESPAÑA.- ENR 1.10: Flight Plan filling from aerodromes and heliports lacking an ARO.

ENR

02OCT25/02OCT26EST

From 27/11/2025 cancelled by NOTAM B8411/25, NOTAM B8412/25

184/25

PALMA DE MALLORCA AD (LEPA/LESJ).- Refurbishment works on Module A and Terminal (EAST AREA).

AD

30OCT25/30OCT26EST

185/25

PALMA DE MALLORCA AD (LEPA/LESJ).- Renovation works of Module D.

AD

30OCT25/30OCT26EST

From 27/11/2025 cancelled by SUP 221/25

186/25

MENORCA AD (LEMH).- Renewal of the security fencing.

AD

30OCT25/30OCT26EST

187/25

FIR MADRID.- Jerez Wind Farm under construction.

ENR

02OCT25/02OCT26EST

188/25

SANTIAGO/Rosalía de Castro AD (LEST).- Runway resurfacing works.

AD

30OCT25/30OCT26EST

189/25

FIR MADRID.- Monte Redondo Wind Farm under construction.

ENR

30OCT25/30OCT26EST

190/25

A CORUÑA AD (LECO).- RWY21 intermediate turning bay unserviceable.

AD

30OCT25/30OCT26EST

191/25

MADRID/Cuatro Vientos AD (LECU/LEVS).- Crane erected in the vicinity of the airport.

AD

30OCT25/30OCT26EST

192/25

MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- TWY F4 and the section of TWY F3 between PRKG 258 and TWY F4 will remain closed.

AD

30OCT25/30OCT26EST

193/25

"BARCELONA /Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of Office Tower ""Torre Porta Diagonal"" in the vicinity of the airport."

AD

27NOV25/27NOV26EST

From 27/11/2025 cancelled by SUP 225/25

194/25

FIR MADRID.- Villanueva Wind Farm under construction.

ENR

27NOV25/27NOV26EST

195/25

MADRID/Adolfo Suárez Madrid- Barajas AD (LEMD).- Low intensity of white PAPI lights on RWY 32L.

AD

30OCT25/30OCT26EST

196/25

FIR MADRID.- Josmanil Wind Farm under construction.

ENR

27NOV25/27NOV26EST

197/25

JEREZ AD (LEJR).- Left runway guard light at TWY E3 unserviceable.

AD

30OCT25/30OCT26EST

From 03/11/2025 cancelled by NOTAM B8388/25

198/25

GIRONA AD (LEGE).- Restrictions to LOC and DME RWY 19 IGN.

AD

27NOV25/27NOV26EST

199/25

FIR MADRID.- Novo Wind Farm under construction.

ENR

27NOV25/27NOV26EST

200/25

FIR MADRID.- Villanueva 2 Wind Farm under construction.

ENR

27NOV25/27NOV26EST

201/25

VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable.

AD

30OCT25/30OCT26EST

202/25

BILBAO AD (LEBB).- Remodelling of markings apron.

AD

30OCT25/30OCT26EST

203/25

FIR MADRID.- Cortijo Nuevo Wind Farm under construction.

ENR

27NOV25/27NOV26EST

204/25

A CORUÑA AD (LECO).- Modification to the OCA/H table in ILS and LOC to RWY 21 procedures.

AD

30OCT25/30OCT26EST

From 27/11/2025 cancelled by SUP 223/25

205/25

SANTIAGO/Rosalía de Castro AD (LEST).- Works to replace ILS/DME RWY 17 “IGO” and ILS/DME RWY 35 “ISO”.

AD

27NOV25/27NOV26EST

206/25

FIR MADRID.- Las Hazas Wind Farm under construction.

ENR

27NOV25/27NOV26EST

207/25

MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport.

AD

27NOV25/27NOV26EST

208/25

BILBAO AD (LEBB).- Compliance works for apron lighting.

AD

27NOV25/27NOV26EST

209/25

FIR MADRID.- Las Cabreras Wind Farm under construction.

ENR

27NOV25/27NOV26EST

210/25

FIR MADRID.- Somozas Wind Farm under construction.

ENR

27NOV25/27NOV26EST

211/25

LOGROÑO AD (LERJ).- Error in TORA board at RWY 29 INT A.

AD

30OCT25/30OCT26EST

212/25

REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7 and on TWY T0, T1 and T2.

AD

30OCT25/05SEP26EST

213/25

SABADELL AD (LELL).- Thresholds identification lights systems of runways 13 and 31 unserviceable.

AD

25DEC25/25DEC26EST

214/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2.

AD

27NOV25/27NOV26EST

215/25

TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system.

AD

27NOV25/03OCT26EST

216/25

MADRID/Cuatro Vientos AD (LECU/LEVS).- Cranes installed in the vicinity of the airport.

AD

27NOV25/27NOV26EST

217/25

FIR MADRID.- Dama de Baza Wind Farm under construction.

ENR

27NOV25/03OCT26EST

218/25

SEVILLA AD (LEZL).- VDF service Sevilla gonio U/S.

AD

27NOV25/27NOV26EST

219/25

ZARAGOZA AD (LEZG).- Instrument approach chart TACAN Z RWY 30R from IAF YARZU not usable.

AD

27NOV25/27NOV26EST

220/25

GRAN CANARIA AD (GCLP).- Restrictions in the manoeuvring area.

AD

25DEC25/25DEC26EST

221/25

PALMA DE MALLORCA AD (LEPA/LESJ).- Renovation works of module D.

AD

27NOV25/27NOV26EST

222/25

FIR MADRID.- Installation of measurement towers at Repotenciación Montes De Cierzo I Wind Farm.

ENR

25DEC25/25DEC26EST

223/25

A CORUÑA AD (LECO).- Modification to the OCA/H table in ILS and LOC to RWY 21 procedures.

AD

27NOV25/27NOV26EST

224/25

ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Split of inner taxiway on apron in front of terminal building.

AD

25DEC25/25DEC26EST

225/25

BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of Office Tower Torre Porta Diagonal in the vicinity of the airport.

AD

27NOV25/27NOV26EST

226/25

MADRID/ Adolfo Suárez Madrid- Barajas AD (LEMD).- Expansion of remote apron at T123 – Ramp 0. New PRKG 27 to 29.

AD

25DEC25/25DEC26EST