RECORD OF AIP SUPPLEMENTS
The following table shows the AIP supplements in force on the publication date of the present amendment and those which have been cancelled respect to the previous amendment record.
| NR/YEAR | SUBJECT | SECTION | VALIDITY | CANCELLATION |
|---|---|---|---|---|
| 152/20 | FIR MADRID.- Transit Corridor established. | ENR | 31DEC20/31DEC21EST | |
| 91/22 | FIR MADRID.- Antonio Valverde Wind Farm under construction. | ENR | 14JUL22/14JUL23EST | |
| 17/23 | PALMA DE MALLORCA AD (LEPA/LESJ).- Aircraft rescue military crane out of service. | AD | 23FEB23/23FEB24EST | |
| 74/23 | FIR MADRID.- Valdehierro Wind Farm under construction. | ENR | 15JUN23/15JUN24EST | |
| 109/23 | FIR MADRID.- San Isidro Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | |
| 177/23 | FIR MADRID.- Canteras I Wind Farm under construction. | ENR | 30NOV23/30NOV24EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 08/24 | MURCIA/San Javier AD (LELC).- Floodlighting poles obstacles lights in civil and military aprons out of service. | AD | 25JAN24/25JAN25EST | |
| 42/24 | FIR MADRID.- Installation of wind turbines and measurement towers at La Cernégula Wind Farm. | ENR | 18APR24/18APR25EST | |
| 59/24 | VALENCIA AD (LEVC).- Perpendicular slope compliance works on levelled strip. | AD | 18APR24/18APR25EST | |
| 110/24 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II. | AD | 13JUN24/26JAN25EST | From 22/01/2026 cancelled by SUP 229/25 |
| 113/24 | FIR MADRID.- Airas Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
| 118/24 | FIR BARCELONA.- San Roque Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | |
| 120/24 | FIR BARCELONA.- La Paul Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 140/24 | FIR MADRID.- Installation of a wind measuring tower within Farelo Wind Farm. | ENR | 08AUG24/08AUG25EST | |
| 142/24 | VALLADOLID/Villanubla AD (LEVD).- RWY 14/32 width reduced. | AD | 05SEP24/05SEP25EST | |
| 155/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works for apron lighting. | AD | 05SEP24/31OCT25EST | From 12/01/2026 cancelled by NOTAM A020126 |
| 158/24 | FIR MADRID.- Aciberos Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 159/24 | FIR MADRID.- Padornelo 3 Wind Farm under construction. | ENR | 03OCT24/03OCT25EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 160/24 | ZARAGOZA AD (LEZG).- Works for drainage adaptation at the manoeuvring area. | AD | 03OCT24/23FEB25EST | |
| 161/24 | FIR CANARIAS.- Instalation of Finca San Juan Wind Farm. | ENR | 03OCT24/03OCT25EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 176/24 | SAN SEBASTIÁN (LESO).- Crane installed in the vicinity of the airport. | AD | 03OCT24/30MAY25EST | |
| 178/24 | FIR MADRID.- San Marcos II Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
| 188/24 | SAN SEBASTIÁN AD (LESO).- Crane installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
| 192/24 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to GP and DME IAT RWY 10. | AD | 28NOV24/28NOV25EST | From 18/12/2025 cancelled by NOTAM E6207/25 |
| 193/24 | FIR MADRID.- La Ese wind farm under construction. | ENR | 26DEC24/26DEC25EST | |
| 194/24 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the vicinity of the airport. | AD | 28NOV24/28NOV25EST | |
| 200/24 | FIR MADRID.- Mondigo Wind Farm under construction. | ENR | 26DEC24/26DEC25EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 202/24 | FIR MADRID.- Rueda Sur Wind 1 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | |
| 203/24 | SABADELL AD (LELL).- PRKG 320 and 321 may only be used as stop and star-up areas for fixed-wing aircraft. | AD | 23JAN25/23JAN26EST | |
| 205/24 | CASTELLÓN AD (LECH).- Aircraft stand closed. | AD | 26DEC24/26DEC25EST | |
| 206/24 | SANTIAGO/Rosalía de Castro AD (LEST).- Modification of the OCA/H Table for the ILS Z and ILS Y approaches to RWY 17. | AD | 26DEC24/26DEC25EST | From 19/02/2026 cancelled by SUP 09/26 |
| 207/24 | FIR BARCELONA.- Les Colladetes wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
| 208/24 | FIR BARCELONA.- Les Colladetes Ampliación wind farm under construction. | ENR | 23JAN25/23JAN26EST | |
| 210/24 | FIR MADRID.- Rueda Sur Wind 3 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 211/24 | FIR MADRID.- Rueda Sur Wind 2 Wind Farm under construction. | ENR | 23JAN25/23JAN26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 01/25 | FIR MADRID.- La Mota Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
| 02/25 | FIR MADRID.- Installation of a measuring tower Los Caños II. | ENR | 20FEB25/20FEB26EST | From 22/12/2025 cancelled by NOTAM P0249/25 |
| 03/25 | FIR MADRID.- Installation of a measuring tower EL HITO. | ENR | 20FEB25/20FEB26EST | |
| 07/25 | IBIZA AD (LEIB).- TWY EH closed. | AD | 23JAN25/23JAN26EST | From 19/02/2026 cancelled by AIRAC 01/26 |
| 10/25 | FIR MADRID.- Monte Becerril Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
| 12/25 | FIR MADRID.- Installation of a measuring tower within El Coto Wind Farm. | ENR | 20FEB25/20FEB26EST | From 22/12/2025 cancelled by NOTAM P0250/25 |
| 13/25 | FIR MADRID.- Salguero Wind Farm under construction. | ENR | 20FEB25/20FEB26EST | |
| 14/25 | ALBACETE AD (LEAB).- Modification of the civil aircraft apron configuration. | AD | 20FEB25/20FEB26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 15/25 | ZARAGOZA AD (LEZG).- Aerodrome with operational limitations. | AD | 23JAN25/23JAN26EST | |
| 16/25 | FIR MADRID.- Miravete Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
| 17/25 | BURGOS/Villafría AD (LEBG).- Installation of a measuring tower within La Laguna Wind Farm. | ENR/AD | 20FEB25/20FEB26EST | From 15/01/2026 cancelled by NOTAM B0324/26 |
| 18/25 | ZARAGOZA AD (LEZG).- Instrument approach chart IAC/4 TACAN Z RWY 12R not usable. | AD | 20MAR25/20MAR26EST | |
| 20/25 | REUS AD (LERS).- Works to adapt the lighting systems to the new technologies and regulations. | AD | 20MAR25/20MAR26EST | From 05/01/2026 cancelled by NOTAM B004626 |
| 24/25 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 20MAR25/20MAR26EST | From 19/02/2026 cancelled by SUP 20/26 |
| 26/25 | FIR MADRID.- Tahivilla-Tarifa Wind Farm under construction. | ENR | 20MAR25/20MAR26EST | |
| 27/25 | MENORCA AD (LEMH).- Renovation of the engine generator control system. | AD | 20MAR25/20MAR26EST | From 19/12/2025 cancelled by NOTAM P0229/25 |
| 29/25 | FIR MADRID.- Installation of a measuring tower within Santa Patricia Wind Farm. | ENR | 20MAR25/20MAR26EST | |
| 31/25 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Restrictions to VOR ALT and associated procedures. | ENR/AD | 20FEB25/20FEB26EST | From 16/01/2026 cancelled by NOTAM E0230/26 |
| 33/25 | FUERTEVENTURA AD (GCFV).- Airfield compliance works. | AD | 20MAR25/20MAR26EST | |
| 35/25 | SALAMANCA/Matacán AD (LESA).- Caution with ILS GP RWY 21. | AD | 20MAR25/20MAR26EST | |
| 38/25 | FIR BARCELONA.- Concejo I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 39/25 | FIR BARCELONA.- La Vacada IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 40/25 | AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation. | ENR | 20MAR25/20MAR26EST | |
| 41/25 | FIR BARCELONA.- La Estrella II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 42/25 | FIR BARCELONA.- Vacada VI Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 45/25 | FIR MADRID.- Installation of a measuring tower within Monte Becerril Wind Farm. | ENR | 17APR25/17APR26EST | |
| 48/25 | REUS AD (LERS).- Vessel crane installed in the vicinity of the airport. | AD | 20MAR25/20MAR26EST | From 12/01/2026 cancelled by NOTAM B0225/26 |
| 49/25 | FIR BARCELONA.- Concejo II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 52/25 | FIR BARCELONA.- Concejo III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 53/25 | FIR BARCELONA.- La Estrella IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 54/25 | ZARAGOZA AD (LEZG).- Wind turbines of the Repotenciación Muel Wind Farm under construction. | ENR/AD | 17APR25/17APR26EST | |
| 57/25 | FIR BARCELONA.- El Cabecero II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 58/25 | FIR BARCELONA.- Cid II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 59/25 | FIR BARCELONA.- Cid III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 60/25 | FIR BARCELONA.- Vacada I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 61/25 | FIR BARCELONA.- Cabecero III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 62/25 | FIR BARCELONA.- Cid I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 63/25 | FIR BARCELONA.- El Cabecero IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 64/25 | FIR BARCELONA.- La Estrella I Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 65/25 | FIR BARCELONA.- La Vacada III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 66/25 | FIR BARCELONA.- Cid IV Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 67/25 | FIR BARCELONA.- La Vacada II Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 68/25 | FIR BARCELONA.- La Estrella III Wind Farm under construction. | ENR | 17APR25/17APR26EST | |
| 69/25 | FIR MADRID.- Blanco Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 71/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Reconfiguration of Ramp 0. | AD | 15MAY25/15MAY26EST | |
| 74/25 | FIR MADRID.- La Colina Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 75/25 | FIR MADRID.- Possible limited radio VHF/UHF coverage in the northeastern part of the area of responsibility ECAO SEVILLA. | ENR | 17APR25/17APR26EST | |
| 76/25 | SANTIAGO/Rosalía de Castro AD (LEST).- RWY 35 approach lighting system (ALS) switched on in provisional configuration. | AD | 17APR25/17APR26EST | |
| 77/25 | FIR MADRID.- Arce Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 78/25 | FIR MADRID.- Los Balazos Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 81/25 | FIR MADRID.- Parrancanas Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 82/25 | SAN SEBASTIÁN AD (LESO).- Cranes installed in the vicinity of the airport. | AD | 17APR25/17APR26EST | |
| 83/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Manoeuvres for entering and exiting PRKG A6, A7 and A8. | AD | 17APR25/17APR26EST | |
| 84/25 | FIR BARCELONA.- Vacada V Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 86/25 | FIR MADRID.- Melguizas Wind Farm under contruction. | ENR | 15MAY25/15MAY26EST | |
| 87/25 | ASTURIAS AD (LEAS).- 50 per cent of TWY B center line lighting system unserviceable. | AD | 17APR25/17APR26EST | From 08/01/2026 cancelled by NOTAM B0126/26 |
| 89/25 | FIR MADRID.- Carricondo Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | |
| 90/25 | FIR MADRID.- Plasencia Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 92/25 | PAMPLONA AD (LEPP).- Works to extend strip. | AD | 15MAY25/15MAY26EST | |
| 93/25 | FIR MADRID.- Installation of a measuring tower within Wind Farm La Arenica. | ENR | 12JUN25/12JUN26EST | |
| 94/25 | AIS ESPAÑA.- Recommendation to flights over Afghanistan. | ENR | 15MAY25/15MAY26EST | |
| 95/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Surface renovation and compliance on TWY S, T and Ramp 2 slabs. | AD | 12JUN25/12JUN26EST | |
| 96/25 | FIR MADRID.- Espilo Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
| 97/25 | FIR MADRID.- A Ruña II Wind Farm under construction. | ENR | 15MAY25/15MAY26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 98/25 | ZARAGOZA AD (LEZG).- RPAS operations. | AD | 15MAY25/15MAY26EST | |
| 100/25 | LOGROÑO AD (LERJ).- Caution when taxiing by TWY A. | AD | 15MAY25/15MAY26EST | |
| 101/25 | FIR MADRID.- Isabela Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
| 104/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Installation of tower cranes in El Prat de Llobregat and impact on the ILS Z RWY 06L manoeuvre. | AD | 15MAY25/15MAY26EST | |
| 105/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on TWY W6. | AD | 12JUN25/12JUN26EST | |
| 107/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Cranes installed in the vicinity of the airport. | AD | 15MAY25/15MAY26EST | |
| 108/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- APAPI FATO 09 out of service. | AD | 15MAY25/15MAY26EST | |
| 109/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on Taxiways A17 and A20 until A24. | AD | 15MAY25/15MAY26EST | |
| 113/25 | FIR MADRID.- Molar del Molinar Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
| 114/25 | SAN SEBASTIÁN AD (LESO).- Additional schedule for Fire Category 7. | AD | 12JUN25/12JUN26EST | |
| 115/25 | ZARAGOZA AD (LEZG).- Availability of facilities and services. | AD | 12JUN25/18APR26EST | |
| 116/25 | MADRID/Getafe AD (LEGT).- AZIMUT TACAN out of service. | AD | 12JUN25/12JUN26EST | From 19/03/2026 cancelled by SUP 17/26 |
| 117/25 | FIR MADRID.- Iglesias Wind Farm under construction. | ENR | 12JUN25/05OCT25EST | |
| 120/25 | FIR MADRID.- La Mudarra Norte Wind Farm under construction. | ENR | 12JUN25/12JUN26EST | |
| 121/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Modification to the OCA/H Table of the RNP Y approach manoeuvre to RWY 11. | AD | 10JUL25/10JUL26EST | |
| 122/25 | ASTURIAS AD (LEAS).- Unmanned aircraft flight areas. | AD | 12JUN25/12JUN26EST | |
| 123/25 | MADRID/Getafe AD (LEGT).- Tower cranes installed in the vicinity of the airport. | AD | 10JUL25/10JUL26EST | |
| 124/25 | LOGROÑO AD (LERJ).- TWR signal lamp out of service. | AD | 12JUN25/12JUN26EST | |
| 126/25 | FIR MADRID.- Repotenciación Montes de Cierzo II Wind Farm under construction. | ENR | 07AUG25/07AUG26EST | |
| 127/25 | FIR MADRID.- Repotenciación Montes de Cierzo Wind Farm under construction. | ENR | 07AUG25/07AUG26EST | |
| 128/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Standard instrument departures RNAV1 for RWY 24L. | AD | 10JUL25/10JUL26EST | From 22/01/2026 cancelled by AIRAC 14/25 |
| 129/25 | FIR MADRID.- Installation of a meteorological tower at Linte II Wind Farm. | ENR | 07AUG25/07AUG26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 130/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed at the port. | AD | 10JUL25/10JUL26EST | |
| 131/25 | ZARAGOZA AD (LEZG).- Crane installed in the vicinity of the airport. | AD | 10JUL25/16MAY26EST | |
| 132/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Modification to the OCA/H table in ILS Z and ILS Y to RWY 24L procedures. | AD | 10JUL25/10JUL26EST | |
| 133/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23. | AD | 07AUG25/07AUG26EST | |
| 134/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Demolition of the regulators chamber – Ramp 0. | AD | 10JUL25/10JUL26EST | |
| 135/25 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Replacement works of the ILS/DME RWY 30 ITF. | AD | 07AUG25/07AUG26EST | |
| 140/25 | FIR MADRID.- La Senda and El Camino Wind Farms under construction. | ENR | 04SEP25/04SEP26EST | |
| 141/25 | MADRID/Getafe AD (LEGT).- Cranes installed in the vicinity of the airport. | AD | 07AUG25/07AUG26EST | |
| 148/25 | BILBAO AD (LEBB).- Works on air TWY D4 and helicopter apron. | AD | 04SEP25/04SEP26EST | |
| 150/25 | JEREZ AD (LEJR).- PRKG H9 closed. | AD | 07AUG25/07AUG26EST | From 12/12/2025 cancelled by NOTAM P0075/25 |
| 152/25 | MADRID/Getafe AD (LEGT).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
| 155/25 | SAN SEBASTIÁN AD (LESO).- Works to replace DME San Sebastián HIG. | AD | 04SEP25/04SEP26EST | |
| 157/25 | FIR MADRID.- Isar-Yudego Wind Farm under construction. | ENR | 04SEP25/04SEP26EST | |
| 158/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
| 159/25 | ZARAGOZA AD (LEZG).- Arresting system completely withdrawn. | AD | 07AUG25/07AUG26EST | |
| 161/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on Taxiways B3, B4, Z3, BN1, N4 and N5. | AD | 04SEP25/04SEP26EST | |
| 162/25 | MADRID/Getafe AD (LEGT).- Installation of four self-propelled cranes and two fire trucks in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | |
| 163/25 | SALAMANCA/Matacán AD (LESA).- RWY 07/25 closed. | AD | 04SEP25/04SEP26EST | |
| 164/25 | PAMPLONA AD (LEPP).- Restrictions to DVOR PPN. | AD | 04SEP25/04SEP26EST | From 22/01/2026 cancelled by SUP 227/25 |
| 165/25 | FIR MADRID.- Ubierna Wind Farm under construction. | ENR | 02OCT25/02OCT26EST | |
| 166/25 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Intermediate holding positions R1-R7 unserviceable. | AD | 04SEP25/04SEP26EST | |
| 167/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Compliance works on apron P1. | AD | 02OCT25/02OCT26EST | |
| 168/25 | BILBAO AD (LEBB).- Works for the dismantling and demolition of the old DVOR/DME BLV. | AD | 02OCT25/02OCT26EST | |
| 172/25 | REUS AD (LERS).- Restriction to LOC IRS. | AD | 02OCT25/02OCT26EST | From 13/01/2026 cancelled by NOTAM E0142/26 |
| 173/25 | IBIZA AD (LEIB).- Repainting of commercial apron W25 LEIB. | AD | 30OCT25/30OCT26EST | |
| 174/25 | MURCIA/San Javier AD (LELC).- Downgraded category of military rescue and fire fighting services. | AD | 02OCT25/02OCT26EST | |
| 175/25 | PALMA DE MALORCA AD (LEPA/LESJ).- Scheduled withdrawal of DVOR/DME of Pollensa. | AD | 30OCT25/30OCT26EST | From 22/01/2026 cancelled by SUP 07/26 |
| 176/25 | ALBACETE AD (LEAB).- Risk of FOD on APN E-1. | AD | 02OCT25/02OCT26EST | |
| 177/25 | FUERTEVENTURA AD (GCFV).- Left wing of PAPI RWY 01 out of service. | AD | 02OCT25/02OCT26EST | |
| 179/25 | MENORCA AD (LEMH).- Upgrading of inspection chambers on the airfield. | AD | 30OCT25/30OCT26EST | |
| 180/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Works for the remodelling of Module A and the Terminal (West Zone). | AD | 30OCT25/30OCT26EST | |
| 181/25 | ZARAGOZA AD (LEZG).- Communications failure circuit not available (VAC 1). | AD | 02OCT25/05SEP26EST | |
| 182/25 | REUS AD (LERS).- Works to replace ILS/DME RWY 25 IRS. | AD | 30OCT25/30OCT26EST | |
| 184/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Refurbishment works on Module A and Terminal (EAST AREA). | AD | 30OCT25/30OCT26EST | From 19/03/2026 cancelled by SUP 15/26 |
| 186/25 | MENORCA AD (LEMH).- Renewal of the security fencing. | AD | 30OCT25/30OCT26EST | |
| 187/25 | FIR MADRID.- Jerez Wind Farm under construction. | ENR | 02OCT25/02OCT26EST | |
| 188/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Runway resurfacing works. | AD | 30OCT25/30OCT26EST | From 19/02/2026 cancelled by SUP 21/26 |
| 189/25 | FIR MADRID.- Monte Redondo Wind Farm under construction. | ENR | 30OCT25/30OCT26EST | |
| 190/25 | A CORUÑA AD (LECO).- RWY21 intermediate turning bay unserviceable. | AD | 30OCT25/30OCT26EST | |
| 191/25 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Crane erected in the vicinity of the airport. | AD | 30OCT25/30OCT26EST | |
| 192/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- TWY F4 and the section of TWY F3 between PRKG 258 and TWY F4 will remain closed. | AD | 30OCT25/30OCT26EST | |
| 194/25 | FIR MADRID.- Villanueva Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 195/25 | MADRID/Adolfo Suárez Madrid- Barajas AD (LEMD).- Low intensity of white PAPI lights on RWY 32L. | AD | 30OCT25/30OCT26EST | |
| 196/25 | FIR MADRID.- Josmanil Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 198/25 | GIRONA AD (LEGE).- Restrictions to LOC and DME RWY 19 IGN. | AD | 27NOV25/27NOV26EST | |
| 199/25 | FIR MADRID.- Novo Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 200/25 | FIR MADRID.- Villanueva 2 Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 201/25 | VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable. | AD | 30OCT25/30OCT26EST | |
| 202/25 | BILBAO AD (LEBB).- Remodelling of markings apron. | AD | 30OCT25/30OCT26EST | From 19/03/2026 cancelled by AIRAC 02/26 |
| 203/25 | FIR MADRID.- Cortijo Nuevo Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 205/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Works to replace ILS/DME RWY 17 IGO and ILS/DME RWY 35 ISO. | AD | 27NOV25/27NOV26EST | |
| 206/25 | FIR MADRID.- Las Hazas Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 207/25 | MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | |
| 208/25 | BILBAO AD (LEBB).- Compliance works for apron lighting. | AD | 27NOV25/27NOV26EST | |
| 209/25 | FIR MADRID.- Las Cabreras Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 210/25 | FIR MADRID.- Somozas Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 211/25 | LOGROÑO AD (LERJ).- Error in TORA board at RWY 29 INT A. | AD | 30OCT25/30OCT26EST | |
| 212/25 | REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7 and on TWY T0, T1 and T2. | AD | 30OCT25/05SEP26EST | |
| 213/25 | SABADELL AD (LELL).- Thresholds identification lights systems of runways 13 and 31 unserviceable. | AD | 25DEC25/25DEC26EST | |
| 214/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2. | AD | 27NOV25/27NOV26EST | |
| 215/25 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system. | AD | 27NOV25/03OCT26EST | From 10/12/2025 cancelled by NOTAM B9498/25 |
| 216/25 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Cranes installed in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | |
| 217/25 | FIR MADRID.- Dama de Baza Wind Farm under construction. | ENR | 27NOV25/03OCT26EST | |
| 218/25 | SEVILLA AD (LEZL).- VDF service Sevilla gonio U/S. | AD | 27NOV25/27NOV26EST | |
| 219/25 | ZARAGOZA AD (LEZG).- Instrument approach chart TACAN Z RWY 30R from IAF YARZU not usable. | AD | 27NOV25/27NOV26EST | |
| 220/25 | GRAN CANARIA AD (GCLP).- Restrictions on the manoeuvring area. | AD | 25DEC25/25DEC26EST | |
| 221/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Renovation works of Module D. | AD | 27NOV25/27NOV26EST | |
| 222/25 | FIR MADRID.- Installation of measurement towers at Repotenciación Montes De Cierzo I Wind Farm. | ENR | 25DEC25/25DEC26EST | |
| 223/25 | A CORUÑA AD (LECO).- Modification to the OCA/H table in ILS and LOC to RWY 21 procedures. | AD | 27NOV25/27NOV26EST | |
| 224/25 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Split of inner taxiway on apron in front of terminal building. | AD | 25DEC25/25DEC26EST | |
| 225/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of Office Tower Torre Porta Diagonal in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | |
| 226/25 | MADRID/ Adolfo Suárez Madrid- Barajas AD (LEMD).- Expansion of remote apron at T123 – Ramp 0. New PRKG 27 to 29. | AD | 25DEC25/25DEC26EST | |
| 227/25 | PAMPLONA AD (LEPP).- Restrictions to DVOR PPN. | AD | 22JAN26/31OCT26EST | |
| 228/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Declared distances. | AD | 25DEC25/04SEP26EST | |
| 229/25 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II. | AD | 22JAN26/22JAN27EST | |
| 230/25 | MADRID/ Adolfo Suárez Madrid- Barajas AD (LEMD).- Installation of mega towers on T123, M5 and M2 area. | AD | 22JAN26/22JAN27EST | |
| 231/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Secondary power supply. | AD | 25DEC25/25DEC26EST | |
| 232/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on taxiways A14, AZ2 and S2. | AD | 22JAN26/22JAN27EST | |
| 233/25 | AIS-ESPAÑA.- Exercise EAGLE EYE 26-01. | ENR | 09FEB26/13FEB26 | From 13/02/2026 cancelled by expiry date |
| 234/25 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Pavement and lighting works on taxiways C5, M5 and C6. | AD | 22JAN26/22JAN27EST | |
| 235/25 | AIS ESPAÑA.- European Tactical Airlift Program Course 26-1 (ETAP-C 26-1). | ENR/AD | 23FEB26/05MAR26 | From 05/03/2026 cancelled by expiry date |
| 236/25 | FIR MADRID.- Replacement of wind turbines in the Sierra de Alaiz experimental Wind Farm. | ENR | 22JAN26/22JAN27EST | |
| 237/25 | AIS-ESPAÑA.- Temporary suspension of RNP APCH manoeuvres to published LPV minima at airports in the Canary Islands. | ENR/AD | 25DEC25/25DEC26EST | |
| 01/26 | FIR MADRID.- Portalrubio Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 02/26 | FIR MADRID.- Miravete Ampliación Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 03/26 | MADRID/ Adolfo Suárez Madrid-Barajas AD (LEMD).- Power line markers out of service. | AD | 22JAN26/22JAN27EST | |
| 04/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Cranes installed in the vicinity of the aerodrome. | AD | 19FEB26/19FEB27EST | |
| 05/26 | FIR MADRID.- Installation of meteorological tower at Salguero Wind Farm. | ENR | 19FEB26/19FEB27EST | |
| 06/26 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Resurfacing on parallel to runway TWY. | AD | 19FEB26/19FEB27EST | From 19/02/2026 cancelled by SUP 23/26 |
| 07/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Scheduled withdrawal of DVOR/DME POS of Pollensa. | AD | 22JAN26/22JAN27EST | |
| 08/26 | FIR MADRID.- Mínguez Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 09/26 | SANTIAGO/Rosalía de Castro AD (LEST).- Modification of the OCA/H Table for the ILS Z and ILS Y approaches to RWY 17. | AD | 19FEB26/26DEC26EST | |
| 10/26 | REUS AD (LERS).- Fuel supply service available. | AD | 19FEB26/28MAR26 | |
| 11/26 | FIR MADRID.- El Castillar Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 12/26 | FIR MADRID.- Las Tadeas Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 13/26 | FIR MADRID.- Los Caños III Measurement Tower. | ENR | 19MAR26/19MAR27EST | |
| 14/26 | ANDORRA-LA SEU D'URGELL AD (LESU).- Aerodrome operational hours. | AD | 19MAR26/19MAR27EST | |
| 15/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Refurbishment works on Module A and Terminal (EAST AREA). | AD | 19MAR26/19MAR27EST | |
| 16/26 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system. | AD | 19FEB26/19FEB27EST | |
| 17/26 | MADRID/Getafe AD (LEGT).- VORTAC VGE out of service. | AD | 19MAR26/19MAR17EST | |
| 18/26 | VITORIA AD (LEVT).- Taxiing restrictions in TXY T4. | AD | 19FEB26/19FEB27EST | |
| 19/26 | BILBAO AD (LEBB).- Pavement repair and improvement works on the South apron. | AD | 19MAR26/19MAR27EST | |
| 20/26 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 19FEB26/19FEB27EST | |
| 21/26 | SANTIAGO/Rosalía de Castro AD (LEST).- Runway resurfacing works. | AD | 19FEB26/19FEB27EST | |
| 22/26 | MADRID / Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on taxiways A11 and A12. | AD | 19MAR26/19MAR27EST | |
| 23/26 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Taxiway pavement rehabilitation parallel to the runway. | AD | 19FEB26/19FEB27EST | |
| 24/26 | FIR MADRID.- Olerón Wind Farm under construction. | ENR | 19MAR26/19MAR27EST |