RECORD OF AIP SUPPLEMENTS
The following table shows the AIP supplements in force on the publication date of the present amendment and those which have been cancelled respect to the previous amendment record.
| NR/YEAR | SUBJECT | SECTION | VALIDITY | CANCELLATION |
|---|---|---|---|---|
| 152/20 | FIR MADRID.- Transit Corridor established. | ENR | 31DEC20/31DEC21EST | |
| 91/22 | FIR MADRID.- Antonio Valverde Wind Farm under construction. | ENR | 14JUL22/14JUL23EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 109/23 | FIR MADRID.- San Isidro Wind Farm under construction. | ENR | 10AUG23/10AUG24EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 42/24 | FIR MADRID.- Installation of wind turbines and measurement towers at La Cernégula Wind Farm. | ENR | 18APR24/18APR25EST | |
| 113/24 | FIR MADRID.- Airas Wind Farm under construction. | ENR | 11JUL24/11JUL25EST | |
| 118/24 | FIR BARCELONA.- San Roque Wind Farm under construction. | ENR | 08AUG24/08AUG25EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 140/24 | FIR MADRID.- Installation of a wind measuring tower within Farelo Wind Farm. | ENR | 08AUG24/08AUG25EST | |
| 160/24 | ZARAGOZA AD (LEZG).- Works for drainage adaptation at the manoeuvring area. | AD | 03OCT24/23FEB25EST | From 01/10/2026 cancelled by SUP 148/26 |
| 178/24 | FIR MADRID.- San Marcos II Wind Farm under construction. | ENR | 31OCT24/31OCT25EST | |
| 15/25 | ZARAGOZA AD (LEZG).- Aerodrome with operational limitations. | AD | 23JAN25/23JAN26EST | From 30/09/2026 cancelled by NOTAM B7995/26 |
| 82/25 | SAN SEBASTIÁN AD (LESO).- Cranes installed in the vicinity of the airport. | AD | 17APR25/17APR26EST | |
| 92/25 | PAMPLONA AD (LEPP).- Works to extend strip. | AD | 15MAY25/15MAY26EST | From 01/10/2026 cancelled by SUP 184/26 |
| 98/25 | ZARAGOZA AD (LEZG).- RPAS operations. | AD | 15MAY25/15MAY26EST | From 30/09/2026 cancelled by NOTAM B7996/26 |
| 115/25 | ZARAGOZA AD (LEZG).- Availability of facilities and services. | AD | 12JUN25/18APR26EST | |
| 123/25 | MADRID/Getafe AD (LEGT).- Tower cranes installed in the vicinity of the airport. | AD | 10JUL25/10JUL26EST | From 28/09/2026 cancelled by NOTAM B7937/26 |
| 140/25 | FIR MADRID.- La Senda and El Camino Wind Farms under construction. | ENR | 04SEP25/04SEP26EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 141/25 | MADRID/Getafe AD (LEGT).- Cranes installed in the vicinity of the airport. | AD | 07AUG25/07AUG26EST | From 28/09/2026 cancelled by NOTAM B7939/26 |
| 152/25 | MADRID/Getafe AD (LEGT).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | From 29/09/2026 cancelled by NOTAM B7969/26 |
| 158/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | From 01/10/2026 cancelled by SUP 189/26 |
| 159/25 | ZARAGOZA AD (LEZG).- Arresting system completely withdrawn. | AD | 07AUG25/07AUG26EST | |
| 162/25 | MADRID/Getafe AD (LEGT).- Installation of four self-propelled cranes and two fire trucks in the vicinity of the airport. | AD | 04SEP25/04SEP26EST | From 28/09/2026 cancelled by NOTAM 7968/26 |
| 163/25 | SALAMANCA/Matacán AD (LESA).- RWY 07/25 closed. | AD | 04SEP25/04SEP26EST | |
| 165/25 | FIR MADRID.- Ubierna Wind Farm under construction. | ENR | 02OCT25/02OCT26EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 176/25 | ALBACETE AD (LEAB).- Risk of FOD on APN E-1. | AD | 02OCT25/02OCT26EST | |
| 179/25 | MENORCA AD (LEMH).- Upgrading of inspection chambers on the airfield. | AD | 30OCT25/30OCT26EST | From 01/10/2026 cancelled by SUP 193/26 |
| 180/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Works for the remodelling of Module A and the Terminal (West Zone). | AD | 30OCT25/30OCT26EST | From 01/10/2026 cancelled by SUP 145/26 |
| 181/25 | ZARAGOZA AD (LEZG).- Communications failure circuit not available (VAC 1). | AD | 02OCT25/02OCT26EST | From 30/09/2026 cancelled by NOTAM B7997/26 |
| 189/25 | FIR MADRID.- Monte Redondo Wind Farm under construction. | ENR | 30OCT25/30OCT26EST | |
| 190/25 | A CORUÑA AD (LECO).- RWY21 intermediate turning bay unserviceable. | AD | 30OCT25/30OCT26EST | From 01/10/2026 cancelled by SUP 191/26 |
| 194/25 | FIR MADRID.- Villanueva Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | From 01/10/2026 cancelled by SUP 188/26 |
| 195/25 | MADRID/Adolfo Suárez Madrid- Barajas AD (LEMD).- Low intensity of white PAPI lights on RWY 32L. | AD | 30OCT25/30OCT26EST | From 25/09/2026 cancelled by NOTAM A6755/26 |
| 196/25 | FIR MADRID.- Josmanil Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | From 01/10/2026 cancelled by SUP 199/26 |
| 199/25 | FIR MADRID.- Novo Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 200/25 | FIR MADRID.- Villanueva 2 Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | From 01/10/2026 cancelled by SUP 197/26 |
| 201/25 | VIGO AD (LEVX).- Thresholds identification lights systems of runways 01 and 19 unserviceable. | AD | 30OCT25/30OCT26EST | |
| 205/25 | SANTIAGO/Rosalía de Castro AD (LEST).- Works to replace ILS/DME RWY 17 IGO and ILS/DME RWY 35 ISO. | AD | 27NOV25/27NOV26EST | |
| 206/25 | FIR MADRID.- Las Hazas Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 207/25 | MÁLAGA/Costa del Sol AD (LEMG).- Crane installed in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | From 03/09/2026 cancelled by NOTAM A5988/26 |
| 208/25 | BILBAO AD (LEBB).- Compliance works for apron lighting. | AD | 27NOV25/27NOV26EST | |
| 209/25 | FIR MADRID.- Las Cabreras Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | From 01/10/2026 cancelled by SUP 195/26 |
| 210/25 | FIR MADRID.- Somozas Wind Farm under construction. | ENR | 27NOV25/27NOV26EST | |
| 211/25 | LOGROÑO AD (LERJ).- Error in TORA board at RWY 29 INT A. | AD | 30OCT25/30OCT26EST | From 29/10/2026 cancelled by SUP 194/26 |
| 212/25 | REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 1 to 7 and on TWY T0, T1 and T2. | AD | 30OCT25/05SEP26EST | From 26/11/2026 cancelled by SUP 211/26 |
| 213/25 | SABADELL AD (LELL).- Thresholds identification lights systems of runways 13 and 31 unserviceable. | AD | 25DEC25/25DEC26EST | |
| 214/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Temporary closure of TWY S2. | AD | 27NOV25/27NOV26EST | |
| 216/25 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Cranes installed in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | From 10/09/2026 cancelled by NOTAM B7332/26 |
| 217/25 | FIR MADRID.- Dama de Baza Wind Farm under construction. | ENR | 27NOV25/03OCT26EST | |
| 220/25 | GRAN CANARIA AD (GCLP).- Restrictions on the manoeuvring area. | AD | 25DEC25/25DEC26EST | |
| 221/25 | PALMA DE MALLORCA AD (LEPA/LESJ).- Renovation works of Module D. | AD | 27NOV25/27NOV26EST | |
| 222/25 | FIR MADRID.- Installation of measurement towers at Repotenciación Montes De Cierzo I Wind Farm. | ENR | 25DEC25/25DEC26EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 224/25 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Split of inner taxiway on apron in front of terminal building. | AD | 25DEC25/25DEC26EST | |
| 225/25 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of Office Tower Torre Porta Diagonal in the vicinity of the airport. | AD | 27NOV25/27NOV26EST | From 29/10/2026 cancelled by SUP 206/26 |
| 226/25 | MADRID/Adolfo Suárez Madrid- Barajas AD (LEMD).- Expansion of remote apron at T123 – Ramp 0. New PRKG 27 to 29. | AD | 25DEC25/25DEC26EST | From 29/10/2026 cancelled by AIRAC 10/26 |
| 227/25 | PAMPLONA AD (LEPP).- Restrictions to DVOR PPN. | AD | 22JAN26/31OCT26EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 228/25 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Declared distances. | AD | 25DEC25/04SEP26EST | From 16/09/2026 cancelled by NOTAM B7539/26 |
| 229/25 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- Electrical improvement works II. | AD | 22JAN26/22JAN27EST | |
| 230/25 | MADRID/ Adolfo Suárez Madrid- Barajas AD (LEMD).- Installation of mega towers on T123, M5 and M2 area. | AD | 22JAN26/22JAN27EST | |
| 236/25 | FIR MADRID.- Replacement of wind turbines in the Sierra de Alaiz experimental Wind Farm. | ENR | 22JAN26/22JAN27EST | |
| 01/26 | FIR MADRID.- Portalrubio Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 02/26 | FIR MADRID.- Miravete Ampliación Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 03/26 | MADRID/ Adolfo Suárez Madrid-Barajas AD (LEMD).- Power line markers out of service. | AD | 22JAN26/22JAN27EST | |
| 04/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Cranes installed in the vicinity of the aerodrome. | AD | 19FEB26/19FEB27EST | From 01/10/2026 cancelled by SUP 185/26 |
| 05/26 | FIR MADRID.- Installation of meteorological tower at Salguero Wind Farm. | ENR | 19FEB26/19FEB27EST | |
| 08/26 | FIR MADRID.- Mínguez Wind Farm under construction. | ENR | 19FEB26/19FEB27EST | |
| 11/26 | FIR MADRID.- El Castillar Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 13/26 | FIR MADRID.- Installation of a measuring tower within Los Caños III Wind Farm. | ENR | 19MAR26/19MAR27EST | |
| 15/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Refurbishment works on Module A and Terminal (EAST AREA). | AD | 19MAR26/19MAR27EST | |
| 16/26 | TENERIFE NORTE/Ciudad de la Laguna AD (GCXO).- RWY 30 approach lighting system. | AD | 19FEB26/19FEB27EST | |
| 17/26 | MADRID/Getafe AD (LEGT).- VORTAC VGE out of service. | AD | 19MAR26/19MAR27EST | |
| 18/26 | VITORIA AD (LEVT).- Taxiing restrictions in TXY T4. | AD | 19FEB26/19FEB27EST | |
| 19/26 | BILBAO AD (LEBB).- Pavement repair and improvement works on the South apron. | AD | 19MAR26/19MAR27EST | From 27/08/2026 cancelled by NOTAM B6993/26 |
| 20/26 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 19FEB26/19FEB27EST | From 26/11/2026 cancelled by SUP 212/26 |
| 21/26 | SANTIAGO/Rosalía de Castro AD (LEST).- Runway resurfacing works. | AD | 19FEB26/19FEB27EST | |
| 22/26 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on taxiways A11 and A12. | AD | 19MAR26/19MAR27EST | |
| 23/26 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- Taxiway pavement rehabilitation parallel to the runway. | AD | 19FEB26/19FEB27EST | |
| 24/26 | FIR MADRID.- Olerón Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 25/26 | FIR MADRID.- La Colina Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 26/26 | FIR MADRID.- Installation of a measuring tower EL HITO. | ENR | 19MAR26/19MAR27EST | |
| 27/26 | LOGROÑO AD (LERJ).- PRKG 1H and 4H closed. | AD | 16APR26/16APR27EST | |
| 28/26 | FIR MADRID.- Salguero Wind Farm under construction. | ENR | 19MAR26/19FEB27EST | |
| 30/26 | FIR MADRID.- Outes Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 31/26 | FIR MADRID.- Monte Becerril Wind Farm under construction. | ENR | 19MAR26/20FEB27EST | |
| 32/26 | FIR MADRID.- Miravete Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 33/26 | HUESCA/Pirineos AD (LEHC).- Lighting systems switching time greater than 15 seconds. | AD | 19MAR26/19MAR27EST | |
| 34/26 | FIR MADRID.- Joluga Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 35/26 | FIR MADRID.- Los Balazos Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 37/26 | FIR MADRID.- Espilo Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 38/26 | FIR MADRID.- Melguizas Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 039/26 | CASTELLÓN AD (LECH).- Temporary modification of the aerodrome’s hours of operation and rescue and firefighting services for public use. | AD | 16APR26/24OCT26 | From 24/10/2026 cancelled by expiry date |
| 40/26 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- Cranes installed in the vicinity of the airport. | AD | 19MAR26/19MAR27EST | |
| 41/26 | FIR MADRID.- Parrancanas Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 43/26 | ZARAGOZA AD (LEZG).- Airside pavement resurfacing and new electric handling‑vehicle cargo parking area. | AD | 16APR26/16APR27EST | |
| 44/26 | FUERTEVENTURA AD (GCFV).- Airfield compliance works. | AD | 19MAR26/19MAR27EST | |
| 45/26 | FIR BARCELONA.- La Vacada IV Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 46/26 | FIR MADRID.- Blanco Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 47/26 | AIS-ESPAÑA.- Military invasion of Ukraine by Russian Federation. | ENR | 19MAR26/19MAR27EST | |
| 48/26 | FIR MADRID.- Arce Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 49/26 | FIR BARCELONA.- La Estrella III Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 50/26 | FIR MADRID.- La Mota Wind Farm under construction. | ENR | 19MAR26/20FEB27EST | |
| 51/26 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Intermediate holding positions unserviaceable. | AD | 19MAR26/19MAR27EST | From 10/09/2026 cancelled by NOTAM B7331/26 |
| 53/26 | FIR MADRID.- Carricondo Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 54/26 | TERUEL AD (LETL).- Presence of cranes at the airport. | AD | 16APR26/16APR27EST | |
| 55/26 | TERUEL AD (LETL).- Aircraft stands closed. | AD | 16APR26/16APR27EST | |
| 58/26 | FIR BARCELONA.- Vacada V Wind Farm under construction. | ENR | 19MAR26/19MAR27EST | |
| 059/26 | FIR BARCELONA.- La Vacada II Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 060/26 | FIR BARCELONA.- Concejo II Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 061/26 | FIR BARCELONA.- La Vacada III Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 062/26 | FIR BARCELONA.- Vacada VI Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 063/26 | FIR BARCELONA.- La Estrella I Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 064/26 | FIR BARCELONA.- La Estrella II Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 065/26 | FIR BARCELONA.- El Cabecero IV Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 066/26 | FIR BARCELONA.- Cid IV Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 067/26 | FIR BARCELONA.- Concejo I Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 068/26 | FIR MADRID.- Coriscada Repotenciación Wind Farm under construction. | ENR | 14MAY26/14MAY27EST | |
| 069/26 | FIR BARCELONA.- Vacada I Win Farm under construction. | ENR | 16APR26/16APR27EST | |
| 070/26 | FIR BARCELONA.- Concejo III Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 071/26 | FIR BARCELONA.- Cid III Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 072/26 | FIR MADRID.- Installation of an anemometric tower within Repotenciación Montes de Cierzo I Wind Farm. | ENR | 14MAY26/14MAY27EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 073/26 | FIR BARCELONA.- El Cabecero II Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 074/26 | FIR BARCELONA.- Cabecero III Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 075/26 | FIR MADRID.- Montañés Wind Farm under construction. | ENR | 14MAY26/14MAY27EST | |
| 076/26 | FIR BARCELONA.- La Estrella IV Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 077/26 | FIR BARCELONA.- Cid I Wind Farm under construction. | ENR | 16APR26/16APR27EST | |
| 079/26 | MADRID/Getafe AD (LEGT).- Possible delays in ARR/DEP and taxiing. | AD | 16APR26/16APR27EST | From 28/09/2026 cancelled by NOTAM B7945/26 |
| 080/26 | SALAMANCA/Matacán AD (LESA).- Caution, arresting barrier operational with limitations. | AD | 14MAY26/14MAY27EST | From 28/09/2026 cancelled by NOTAM B7940/26 |
| 083/26 | FIR MADRID.- Temporary unavailability of DVOR/DME ROBLEDILLO (RBO). | ENR/AD | 14MAY26/14MAY27EST | From 24/09/2026 cancelled by NOTAM E4353/26 |
| 084/26 | IBIZA AD (LEIB).- Repainting of commercial apron W25 LEIB. | AD | 14MAY26/14MAY27EST | From 26/11/2026 cancelled by SUP 202/26 |
| 085/26 | MURCIA/San Javier AD (LELC).- Downgraded category of military rescue and fire fighting services. | AD | 14MAY26/14MAY27EST | |
| 086/26 | VITORIA AD (LEVT).- Amendment to the OCA/H table in the VOR procedure to RWY 04 and step-down fix removed. | AD | 11JUN26/11JUN27EST | |
| 087/26 | FIR MADRID.- Parapanda Wind Farm under construction. | ENR | 11JUN26/11JUN27EST | |
| 088/26 | A CORUÑA AD (LECO).- Modification to the OCA/H table in ILS X and LOC Y to RWY 21 procedures. | AD | 14MAY26/14MAY27EST | |
| 089/26 | SALAMANCA/Matacán AD (LESA).- Caution with ILS GP RWY 21. | AD | 14MAY26/14MAY27EST | |
| 090/26 | AIS ESPAÑA.- Recommendation to flights over Afghanistan. | ENR | 11JUN26/11JUN27EST | |
| 091/26 | FIR MADRID.- Installation of a measuring tower within Monte Becerril Wind Farm. | ENR | 14MAY26/17APR27EST | |
| 092/26 | MÁLAGA/Costa del Sol AD (LEMG).- Modification to the OCA/H table in ILS Z RWY 31 procedure. | AD | 14MAY26/14MAY27EST | |
| 093/26 | FIR MADRID.- Virgen de las Angustias Wind Farm under construction. | ENR | 11JUN26/11JUN27EST | |
| 095/26 | ASTURIAS AD (LEAS).- Unmanned aircraft flight areas. | AD | 14MAY26/14MAY27EST | |
| 096/26 | LOGROÑO AD (LERJ).- Caution when taxiing by TWY A. | AD | 14MAY26/14MAY27EST | |
| 097/26 | SABADELL AD (LELL).- Cranes installed in the vicinity of the airport. | AD | 14MAY26/14MAY27EST | |
| 098/26 | FIR BARCELONA.- Cid II Wind Farm under construction. | ENR | 14MAY26/17APR27EST | |
| 099/26 | FIR MADRID.- Carrugueiro Wind Farm under construction. | ENR | 14MAY26/14MAY27EST | |
| 101/26 | FIR MADRID.- Repotenciación Montes de Cierzo I Wind Farm under construction. | ENR | 09JUL26/09JUL27EST | |
| 102/26 | FIR MADRID.- Santa María de las Fuentes Wind Farm under construction. | ENR | 09JUL26/09JUL27EST | |
| 103/26 | BURGOS/Villafría AD (LEBG).- Left side stop bar sign on TWY B and runway sign indicating entry to TWY B unserviceable. | AD | 11JUN26/11JUN27EST | |
| 105/26 | MADRID/Getafe AD (LEGT).- NDB GE 421 KHZ out of service. | AD | 11JUN26/11JUN27EST | |
| 106/26 | GRAN CANARIA AD (GCLP).- Rapid exit taxiway S8 temporarily closed. | AD | 11JUN26/11JUN27EST | |
| 107/26 | REUS AD (LERS).- Restrictions to VFR operations and training/school flights subject to aerodrome available capacity. | AD | 11JUN26/31OCT26 | From 31/10/2026 cancelled by expiry date |
| 108/26 | CANARIAS FIR (GCCC).- Scheduled withdrawal of DVOR/DME LCP of Gran Canaria airport. | AD | 11JUN26/11JUN27EST | |
| 109/26 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- Lighting Improvement Works. | AD | 09JUL26/09JUL27EST | |
| 110/26 | SABADELL AD (LELL).- Reconfiguration of apron R3. | AD | 09JUL26/09JUL27EST | |
| 111/26 | VIGO AD (LEVX).- Upgrade of visual aids to LED technology. | AD | 09JUL26/09JUL27EST | |
| 113/26 | GETAFE AD (LEGT).- Tower crane installed in the vicinity of the airport. | AD | 09JUL26/09JUL27EST | |
| 115/26 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing on TWY EA5 and Ramp 23. | AD | 06AUG26/06AUG27EST | |
| 116/26 | FIR MADRID.- Caparroso Wind Farm under construction. | ENR | 06AUG26/06AUG27EST | |
| 117/26 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Intermediate holding positions R1-R7 unserviceable. | AD | 09JUL26/09JUL27EST | |
| 118/26 | FIR MADRID.- ZUA-01 wind turbine under construction. | ENR | 06AUG26/06AUG27EST | |
| 119/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Reconfiguration of Ramp 0 and upgrading of the lighting on Ramps 0 and 1. | AD | 06AUG26/06AUG27EST | |
| 121/26 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- Apron expansion phase 1 North Zone. | AD | 06AUG26/06AUG27EST | |
| 122/26 | MÁLAGA/Costa del Sol AD (LEMG).- RWY 31 RVR out of service. | AD | 09JUL26/09JUL27EST | From 04/09/2026 cancelled by NOTAM A6067/26 |
| 123/26 | MELILLA AD (GEML).- MIA NDB temporarily unserviceable. | AD | 09JUL26/09JUL27EST | |
| 124/26 | MELILLA HELC (GEHM).- MIA NDB temporarily unserviceable. | AD | 09JUL26/09JUL27EST | |
| 125/26 | FIR MADRID.- Azabache Wind Farm under construction. | ENR | 06AUG26/06AUG27EST | |
| 126/26 | CÓRDOBA AD (LEBA).- Threshold identification lights systems of RWY 03 and RWY 21 unserviceable. | AD | 06AUG26/06AUG27EST | |
| 127/26 | FIR MADRID.- Repotenciacion Serralta and San Gregorio Wind Farms under construction. | ENR | 06AUG26/06AUG27EST | |
| 128/26 | AIS-ESPAÑA.- Temporary suspension of RNP APCH manoeuvres to published LPV minima at airports in the Canary Islands. | ENR/AD | 09JUL26/25DEC26EST | |
| 129/26 | FIR MADRID.- Sarracín Wind Farm under construction. | ENR | 09JUL26/09JUL27EST | |
| 130/26 | BILBAO AD (LEBB).- Works on air TWY D4 and helicopter apron. | AD | 06AUG26/06AUG27EST | |
| 131/26 | FIR MADRID.- Installation of meteorological tower at El Castillar Wind Farm. | ENR | 03SEP26/03SEP27EST | |
| 132/26 | FIR MADRID.- Canales Sur Wind Farm under construction. | ENR | 03SEP26/03SEP27EST | |
| 133/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- CAT A stop bar lighting. | AD | 03SEP26/03SEP27EST | |
| 134/26 | ZARAGOZA AD (LEZG).- New markings on aprons. | AD | 03SEP26/03SEP27EST | |
| 136/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Modification to the OCA/H table in ILS Z and ILS Y to RWY 24L procedures. | AD | 06AUG26/06AUG27EST | |
| 137/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Resurfacing and widening of SOUTH taxiways. | AD | 03SEP26/03SEP27EST | From 26/11/2026 cancelled by SUP 213/26 |
| 138/26 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Tower crane installed in the vicinity of the airport. | AD | 06AUG26/06AUG27EST | From 28/09/2026 cancelled by NOTAM B7938/26 |
| 139/26 | SEVILLA AD (LEZL).- NDB Sevilla (SPP) out of service. | AD | 06AUG26/06AUG27EST | From 24/08/2026 cancelled by NOTAM E3915/26 |
| 140/26 | MADRID / Adolfo Suárez Madrid-Barajas AD (LEMD).- Resurfacing works on Taxiways M13-M14. | AD | 03SEP26/03SEP27EST | |
| 141/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Surface renovation and compliance on TWY S, T and Ramp 2 slabs. | AD | 06AUG26/06AUG27EST | |
| 142/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of a new rapid exit taxiway from RWY 02/20. | AD | 03SEP26/03SEP27EST | |
| 143/26 | GIRONA AD (LEGE).- Restrictions to LOC and GP RWY 19 IGN. | AD | 03SEP26/03SEP27EST | From 26/11/2026 cancelled by AIRAC 11/26 |
| 144/26 | FIR MADRID.- Installation of a measuring tower within Híbrido Jerez Wind Farm. | ENR | 01OCT26/01OCT27EST | |
| 145/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Works to remodel of Module A and the Terminal (West Apron). | AD | 01OCT26/01OCT27EST | |
| 146/26 | LOGROÑO AD (LERJ).- GP ILO temporarily unserviceable. | AD | 03SEP26/03SEP27EST | |
| 147/26 | AIS ESPAÑA.- European Tactical Airlift Program Course 26-4 (ETAP-C 26-4). | ENR/AD | 09NOV26/20NOV26 | From 20/11/2026 cancelled by expiry date |
| 148/26 | ZARAGOZA AD (LEZG).- Continuation of works for drainage compliance in the movement area. | AD | 01OCT26/01OCT27EST | |
| 149/26 | AIS-ESPAÑA.- DÍA DE LA FIESTA NACIONAL 2026 air parade. | ENR/AD | 28SEP26/12OCT26 | From 13/10/2026 cancelled by expiry date |
| 150/26 | MELILLA AD (GEML).- Removal of disabled aircraft out of service. | AD | 03SEP26/03SEP27EST | |
| 151/26 | SABADELL AD (LELL).- Cranes installed in the vicinity of the airport. | AD | 03SEP26/03SEP27EST | |
| 152/26 | FIR MADRID.- Cortijo Nuevo Wind Farm under construction. | ENR | 03SEP26/03SEP27EST | |
| 153/26 | MADRID/Cuatro Vientos AD (LECU/LEVS).- Crane erected in the vicinity of the airport. | AD | 03SEP26/03SEP27EST | |
| 154/26 | BURGOS/Villafría AD (LEBG).- Pilot controlled lighting unserviceable. | AD | 03SEP26/03SEP27EST | |
| 155/26 | LA PALMA AD (GCLA).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 156/26 | GRAN CANARIA AD (GCLP).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 157/26 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 158/26 | TENERIFE SUR AD (GCTS).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 159/26 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 160/26 | ALICANTE/Alicante-Elche Miguel Hernández AD (LEAL).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 161/26 | ALMERÍA AD (LEAM).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 162/26 | ASTURIAS AD (LEAS).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 163/26 | CÓRDOBA AD (LEBA).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 164/26 | BURGOS/Villafría AD (LEBG).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 165/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 166/26 | A CORUÑA AD (LECO).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 167/26 | GIRONA AD (LEGE).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 168/26 | HUESCA/Pirineos AD (LEHC).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 169/26 | IBIZA AD (LEIB).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 170/26 | JEREZ AD (LEJR).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 171/26 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 172/26 | MÁLAGA/Costa del Sol AD (LEMG).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 173/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 174/26 | PAMPLONA AD (LEPP).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 175/26 | LOGROÑO AD (LERJ).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 176/26 | REUS AD (LERS).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 177/26 | SAN SEBASTIÁN AD (LESO).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 178/26 | VALENCIA AD (LEVC).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 179/26 | VITORIA AD (LEVT).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 180/26 | VIGO AD (LEVX).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 181/26 | SANTANDER/Seve Ballesteros-Santander AD (LEXJ).- RNP APCH manoeuvres with LPV minima unserviceable. | AD | 03SEP26/03SEP27EST | |
| 183/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Refurbishment works on Module A (east area) and Module B. | AD | 29OCT26/29OCT27EST | |
| 184/26 | PAMPLONA AD (LEPP).- Works to extend strip. | AD | 01OCT26/15MAY27EST | |
| 185/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the aerodrome. | AD | 01OCT26/01OCT27EST | From 05/10/2026 cancelled by NOTAM A7026/26 |
| 186/26 | A CORUÑA AD (LECO).- Modification to the OCA/H table in ILS Z to RWY 21 procedure. | AD | 01OCT26/01OCT27EST | |
| 187/26 | MADRID/Adolfo Suárez Madrid-Barajas AD (LEMD).- Temporary unavailability of DVOR/DME NVS. | AD | 29OCT26/29OCT27EST | |
| 188/26 | FIR MADRID.- Villanueva Wind Farm under construction. | ENR | 01OCT26/01OCT27EST | |
| 189/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Crane installed in the vicinity of the airport. | AD | 01OCT26/04SEP27EST | |
| 190/26 | VIGO AD (LEVX).- Modification to the OCA/H table in ILS Y RWY 19 (IAC 8) procedure. | AD | 01OCT26/01OCT27EST | |
| 191/26 | A CORUÑA AD (LECO).- RWY 21 intermediate turning bay unserviceable. | AD | 01OCT26/01OCT27EST | |
| 192/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Temporary unavailability of DVOR/DME Capdepera (CDP). | ENR/AD | 02NOV26/02NOV27EST | |
| 193/26 | MENORCA AD (LEMH).- Upgrading of inspection chambers on the airfield. | AD | 01OCT26/01OCT27EST | |
| 194/26 | LOGROÑO AD (LERJ).- Errors in TORA boards at RWY 29 INT A and RWY 29 INT B/RWY 11 INT B. | AD | 29OCT26/29OCT27EST | |
| 195/26 | FIR MADRID.- Las Cabreras Wind Farm under construction. | ENR | 01OCT26/01OCT27EST | |
| 196/26 | AIS-ESPAÑA.- SIRIO-DRAGÓN-TORMENTA 2026 exercise. | ENR | 19OCT26/29OCT26 | From 29/10/2026 cancelled by expiry date |
| 197/26 | FIR MADRID.- Villanueva 2 Wind Farm under construction. | ENR | 01OCT26/01OCT27EST | |
| 198/26 | ALMERÍA AD (LEAM).- Aerodrome use restrictions for training and flight school operations. | AD | 01OCT26/24OCT26 | From 24/10/2026 cancelled by expiry date |
| 199/26 | FIR MADRID.- Josmanil Wind Farm under construction. | ENR | 01OCT26/01OCT27EST | |
| 200/26 | LANZAROTE/César Manrique Lanzarote AD (GCRR).- Airfield improvement works. | AD | 29OCT26/29OCT27EST | |
| 201/26 | MELILLA AD (GEML).- Threshold identification lights systems of RWY 33 unserviceable. | AD | 29OCT26/29OCT27EST | |
| 202/26 | IBIZA AD (LEIB).- Repainting of commercial apron W25 LEIB. | AD | 26NOV26/26NOV27EST | |
| 203/26 | TENERIFE NORTE/Ciudad de La Laguna AD (GCXO).- Restrictions on DVOR and DME LRO. | AD | 29OCT26/29OCT27EST | |
| 204/26 | ALMERÍA AD (LEAM).- Temporary unavailability of VOR/DME AMR. | ENR/AD | 26NOV26/26NOV27EST | |
| 205/26 | BILBAO AD (LEBB).- Adjustment of taxiway margins at various taxiways. | AD | 26NOV26/26NOV27EST | |
| 206/26 | BARCELONA/Josep Tarradellas Barcelona-El Prat AD (LEBL).- Construction of Office Tower Torre Porta Diagonal in the vicinity of the airport. | AD | 29OCT26/29OCT27EST | |
| 207/26 | ASTURIAS AD (LEAS).- Threshold identification lights systems of RWY 11 unserviceable. | AD | 29OCT26/29OCT27EST | |
| 208/26 | BILBAO AD (LEBB).- Replacement works on passenger boarding bridges on the north apron. | AD | 26NOV26/26NOV27EST | |
| 209/26 | ASTURIAS AD (LEAS).- Obstacle lights WDI CAB 11 and WDI INTERMEDIATE unserviceable. | AD | 29OCT26/29OCT27EST | |
| 210/26 | MADRID/Getafe AD (LEGT).- RWY 04: lights out of service. | AD | 29OCT26/29OCT27EST | |
| 211/26 | REUS AD (LERS).- Works to improve load bearing capacity on apron for PRKG 5 to 7 and on TWY T1 and T2. | AD | 26NOV26/26NOV27EST | |
| 212/26 | MENORCA AD (LEMH).- Renewal of the runway edge lighting system. | AD | 26NOV26/20MAR27 | |
| 213/26 | PALMA DE MALLORCA AD (LEPA/LESJ).- Resurfacing and widening of SOUTH taxiways. | AD | 26NOV26/26NOV27EST |