AIP

ESPAÑA

AD 2 - GCRR IAC 10IAC 9

WEF 03-SEP-26WEF 11-JUN-26

CHANGES:

MOCA, AD ELEVATION, CONTROLLING OBSTACLES, RENUMBERING, NO CIRCLING.

AERONAUTICAL DATABASE REQUIREMENTS

INSTRUMENT APPROACH PROCEDURES

VOR B

POINT

LAT

LONG

TRUE BEARING

DISTANCE DME (NM)

DVOR/DME LTE (IAF)

285653.45N

0133604.8W

TUXAM (IF)

290750.8N

0132909.7W

029.00º (LTE)

12.50 DME LTE

FAF

290322.6N

0133159.3W

029.00º (LTE)

7.40 DME LTE

MAPT

285812.3N

0133515.21W

029.00º (LTE)

1.50 DME LTE

Non-precision final approach - Slope (Descent angle)

CRITICAL DME

FACILITY (ID)

FREQ/CH

COORD

LZR DME

115.2 / 99X

290956.4346 N 0133039.5646 W

NOTES APPLICABLE TO ALL APPROACHES:

  • Speed control:

  1. Unless otherwise instructed by ATC, cross:

    • IAS 200 kt over IF TUXAM;

    • IAS 170 kt at 9.4 DME LTE;

    • IAS 160 kt at 4.4 DME LTE.

  2. If unable to comply, advise ATC on first contact.