ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 104/24
13-JUN-24
ENR
CANCEL: SUP 81/23
SUP 104/24
13JUN24/13JUN25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 13 June 2025 (estimated), three wind turbines and a meteorological tower will be under construction at Acibal Wind Farm, in the municipality of Concello de Moraña (Pontevedra).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P11-0232 AC01 Windmill | 423129.18N 0083601.87W | 744 | 165 |
P11-0232 AC02 Windmill | 423145.77N 0083617.06W | 695 | 165 |
P11-0232 AC03 Windmill | 423119.82N 0083555.13W | 750 | 165 |
MET tower | 423113.68N 0083542.16W | - | 90 |
Mobile crane | - | - | 125 |