FIR MADRID.- Cascante II Wind Farm under construction.
Until 11 July 2025 (estimated), eight windmill and one measuring tower will be under construction at Cascante II Wind Farm, in the municipality of Cascante (Navarra).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P18-0363 AG 01 | 415939.43N 0014225.93W | 675 | 200 |
P18-0363 AG 04 | 415912.27N 0014310.80W | 700 | 200 |
P18-0363 AG 05 | 415918.70N 0014325.75W | 700 | 200 |
P18-0363 AG 06 | 415847.90N 0014349.66W | 718 | 200 |
P18-0363 AG 07 | 415837.59N 0014413.64W | 712 | 200 |
P21-0637 AG 01 | 415931.87N 0014242.81W | 685 | 200 |
P21-0637 AG 02 | 415923.25N 0014257.72W | 696 | 200 |
P23-0187 | 415827.86N 0014424.82W | 721 | 200 |
P23-0187 Tower | 415910.66N 0014335.00W | 557 | 120 |
Mobile crane | - | - | 180 |