SUP
131/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
131/24
08-AUG-24
ENR
CANCEL: 140/23
SUP
131/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 08 August 2025 (estimated), eight wind turbines will be under construction at Santos de la Piedra Wind Farm, in the municipalities of Pozondón and Bronchales (Teruel).
For its construction, the installation of eight cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P16-0014-AE1 Windmill | 403424.08N 0013124.10W | 1533 | 150 |
P16-0014-AE2 Windmill | 403415.46N 0013114.68W | 1515 | 150 |
P16-0014-AE3 Windmill | 403404.40N 0013111.31W | 1499 | 150 |
P16-0014-AE4 Windmill | 403351.68N 0013101.17W | 1508 | 150 |
P16-0014-AE5 Windmill | 403340.54N 0013059.97W | 1494 | 150 |
P16-0014-AE6 Windmill | 403329.84N 0013054.94W | 1477 | 150 |
P16-0014-AE7 Windmill | 403317.66N 0013103.33W | 1473 | 150 |
P16-0014-AE8 Windmill | 403306.14N 0013108.00W | 1458 | 150 |
P16-0014 Crane 1 | 403424.00N 0013123.36W | 1533 | 130 |
P16-0014 Crane 2 | 403414.84N 0013114.55W | 1515 | 130 |
P16-0014 Crane 3 | 403403.84N 0013110.91W | 1499 | 130 |
P16-0014 Crane 4 | 403351.07N 0013101.40W | 1508 | 130 |
P16-0014 Crane 5 | 403339.94N 0013059.70W | 1494 | 130 |
P16-0014 Crane 6 | 403329.24N 0013054.66W | 1477 | 130 |
P16-0014 Crane 7 | 403318.14N 0013102.78W | 1473 | 130 |
P16-0014 Crane 8 | 403306.70N 0013107.83W | 1458 | 130 |