SUP
134/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
134/24
08-AUG-24
ENR
CANCEL: 156/23
SUP
134/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 08 August 2025 (estimated), eleven wind turbines will be under construction at Iglesias Wind Farm in the municipalities of Iglesias, Hontanas, Los Balbases and Tamarón (Burgos).
For their construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0114 T04 Windmill | 421803.89N 0040309.27W | 1117 | 200 |
P20-0114 T05 Windmill | 421750.26N 0040303.41W | 1119 | 200 |
P20-0114 T06 Windmill | 421739.70N 0040247.77W | 1144 | 200 |
P20-0114 T09 Windmill | 421643.17N 0040207.28W | 1126 | 200 |
P20-0114 T10 Windmill | 421620.46N 0040201.49W | 1142 | 200 |
P20-0114 T11 Windmill | 421600.32N 0040158.46W | 1129 | 200 |
P20-0114 T12 Windmill | 421714.05N 0040100.37W | 1124 | 200 |
P20-0114 T13 Windmill | 421700.03N 0040046.95W | 1126 | 200 |
P20-0114 T14 Windmill | 421626.10N 0040103.26W | 1127 | 200 |
P20-0114 T15 Windmill | 421617.03N 0040026.40W | 1127 | 200 |
P20-0114 T16 Windmill | 421602.89N 0040011.38W | 1124 | 200 |
P20-0114 Mobile crane | – | – | 160 |