SUP
140/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
140/24
08-AUG-24
ENR
CANCEL: SUP 98/24
SUP
140/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 08 August 2025 (estimated), one wind measurement tower will be under construction at Faro-Farelo Wind Farm, in the municipality of Agolada (Pontevedra).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0195 Measurement Tower | 424542.62N 0075736.29W | 916 | 121 |
P23-0195 Mobile crane | - | - | 121 |