SUP
194/24
28NOV24/28NOV25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
194/24
28-NOV-24
AD
SUP
194/24
28NOV24/28NOV25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 28 November 2025 (estimated), two cranes will be installed simultaneously in the vicinity of the airport following the phases indicated in the following table.
The start and end dates of each of the phases will be announced via the corresponding NOTAM.
The characteristics of the site and the elevation of the cranes are as follows:
COORD | ELEV (M AMSL) | HGT (M) |
432628.73N 0034943.15W | 48 | 42 |
432626.65N 0034943.42W | 48 | 42 |
COORD | ELEV (M AMSL) | HGT (M) |
432628.67N 0034938.51W | 48 | 42 |
432626.59N 0034938.78W | 48 | 42 |
COORD | ELEV (M AMSL) | HGT (M) |
432628.37N 0034934.25W | 48 | 42 |
432626.29N 0034934.53W | 48 | 42 |
COORD | ELEV (M AMSL) | HGT (M) |
432628.08N 0034930.01W | 48 | 42 |
432625.99N 0034930.28W | 48 | 42 |