Until 12 June 2026 (estimated), three wind turbines will be under construction at La Mudarra Norte Wind Farm, in the municipality of Mudarra (Valladolid).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0304 LAMN 01 | 414828.84N 0045855.21W | 1027 | 180 |
P23-0304 LAMN 02 | 414819.83N 0045843.62W | 1027 | 180 |
P23-0304 LAMN 03 | 414811.05N 0045832.22W | 1026 | 180 |
Mobile crane | - | - | 160 |