SUP
137/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
137/25
07-AUG-25
EFFECTIVE DATE WEF
AD
SUP
137/25
07AUG25/07AUG26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 07 August 2026 (estimated), the DVOR/DME BTZ shall be out of service due to system replacement (see NOTAM LFBZ F0359/25).
The instrumental manoeuvres affected by the scheduled unavailability of the DVOR/DME BTZ are set out below:
LESO SID 1 RWY 04 BTZ1B, BLV4B, CEGAM3D, PPN1B: procedures not usable.
LESO SID 2 RWY 04 BTZ1Z, BLV2Z, CEGAM2Z, PPN1Z: procedures not usable.
LESO SID 4 RWY 22 BTZ2A: procedures not usable.
LESO SID 5 RWY 22 BTZ1Y: procedures not usable.
LESO IAC 1 VOR RWY 22: initial segment, of the approachs, from IAF BTZ and IAF OSGOT not usable.