AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

85/25

17-APR-25

ENR

CANCEL: SUP 71/24

SUP 85/25

17APR25/17APR26EST

FIR BARCELONA.- Mareas II Wind Farm under construction.

Until 17 April 2026 (estimated), nine winds turbines and meteorological measurement tower will be under construction at Mareas II Wind Farm, in the municipality of Mequinenza (Zaragoza).

For its construction the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element, are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P21-0607 MR2_01 Windmill

411758.55N 0001547.82W

628

190

P21-0607 MR2_02 Windmill

411804.94N 0001608.54W

626

190

P21-0607 MR2_03 Windmill

411813.08N 0001627.68W

624

190

P21-0607 MR2_04 Windmill

411826.22N 0001640.33W

620

190

P21-0607 MR2_05 Windmill

411841.43N 0001640.56W

617

190

P21-0607 MR2_06 Windmill

411855.69N 0001649.85W

618

190

P21-0607 MR2_07 Windmill

411922.19N 0001647.55W

619

190

P21-0607 MR2_08 Windmill

411935.81N 0001639.28W

617

190

P21-0607 MR2_09 Windmill

411951.07N 0001634.82W

615

190

P21-0607 TMP_MR2 Tower

411943.26N 0001618.75W

529

108

P21-0607 Mobile crane

-

-

150