SUP
28/26
19MAR26/19FEB27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
28/26
19-MAR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 13/25
SUP
28/26
19MAR26/19FEB27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 February 2027 (estimated), five wind turbines will be under construction at Salguero Wind Farm, in the municipalities of Becerril de Campos y Paredes de Nava (Palencia).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Aerogenerador SAL-01 | 420803.05N 0043932.34W | 1027 | 206 |
Aerogenerador SAL-02 | 420814.05N 0043855.51W | 1028 | 206 |
Aerogenerador SAL-03 | 420805.64N 0043843.1W | 1030 | 206 |
Aerogenerador SAL-04 | 420758.29N 0043828.23W | 1029 | 206 |
Aerogenerador SAL-05 | 420852.27N 0043853.59W | 1033 | 206 |
Grúa móvil 1 | - | - | 142 |