Until 19 March 2027 (estimated), a measurement tower will be under construction at Santa Patricia Wind Farm, in the municipality of Gurrea de Gállego (Huesca).
The projected height, elevation and location are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0457 TM Santa Patricia | 420350.41N 0004842.58W | 516 | 132 |