SUP
32/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
32/26
19-MAR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 16/25
SUP
32/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), six wind turbines will be under construction at Miravete wind farm,in the municipality of Valle de las Navas (Burgos).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
MIR-01 | 422553.70N 0033928.52W | 1089 | 164 |
MIR-02 | 422542.53N 0033927.22W | 1124 | 164 |
MIR-03 | 422533.34N 0033918.55W | 1135 | 164 |
MIR-04 | 422527.35N 0033905.71W | 1129 | 164 |
MIR-05 | 422516.50N 0033857.11W | 1133 | 164 |
MIR-06 | 422502.37N 0033855.56W | 1133 | 164 |
Mobile crane | - | - | 164 |