19-MAR-26
EFFECTIVE DATE WEF
AD
CANCEL: SUP 194/24
SUP
40/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), two cranes will be installed simultaneously in the vicinity of the airport following the phases indicated in the following table.
The start and end dates of each of the phases will be announced via the corresponding NOTAM.
The characteristics of the site and the elevation of the cranes are as follows:
PHASE 2B
COORD | ELEV (M AMSL) | HGT (M) |
432628.08N 0034930.01W | 48 | 42 |
432625.99N 0034930.28W | 48 | 42 |
PHASE 3A
COORD | ELEV (M AMSL) | HGT (M) |
432624.81N 0034926.11W | 48 | 42 |
432625.72N 0034926.38W | 48 | 42 |
PHASE 3B
COORD | ELEV (M AMSL) | HGT (M) |
432627.51N 0034921.86W | 48 | 42 |
432625.43N 0034922.13W | 48 | 42 |