SUP
41/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
41/26
19-MAR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 81/25
SUP
41/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), five wind turbines will be under construction at the Parrancanas wind farm, in the municipalities of Tíjola and Lúcar (Almería).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below.
ID | COORD | ELEV (M AMSL) | HGT(M) |
P20-0181_PA-01 Wind turbine | 372419.61N 0022927.98W | 1176 | 188 |
P20-0181_PA-02 Wind turbine | 372431.24N 0022922.66W | 1183 | 188 |
P20-0181_PA-03 Wind turbine | 372349.31N 0022845.93W | 1123 | 188 |
P20-0181_PA-04 Wind turbine | 372526.46N 0022851.97W | 1323 | 188 |
P20-0181_PA-05 Wind turbine | 372442.01N 0022837.83W | 1212 | 188 |
P20-0181 Mobile crane | - | - | 125 |