SUP
53/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
53/26
19-MAR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 89/25
SUP
53/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), nine wind turbines will be under construction in the municipality of Caniles (Granada).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0203_CA-01 | 372551.61N 0023637.42W | 1208 | 188 |
P20-0203_CA-02 | 372608.04N 0023638.27W | 1210 | 188 |
P20-0203_CA-03 | 372624.82N 0023641.20W | 1206 | 188 |
P20-0203_CA-04 | 372644.44N 0023637.72W | 1216 | 188 |
P20-0203_CA-05 | 372658.40N 0023639.27W | 1206 | 188 |
P20-0203_CA-06 | 372711.42N 0023632.73W | 1207 | 188 |
P20-0203_CA-07 | 372715.03N 0023613.79W | 1221 | 188 |
P20-0203_CA-08 | 372726.30N 0023558.18W | 1227 | 188 |
P20-0203_CA-09 | 372741.82N 0023550.12W | 1229 | 188 |
Mobile crane | - | - | 125 |