SUP
58/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
58/26
19-MAR-26
ENR
CANCELAR: SUP 84/25
SUP
58/26
19MAR26/19MAR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 19 March 2027 (estimated), four wind turbines will be under construction at Vacada V Wind Farm, in the municipality of Fortanete (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0058-VA5-01 | 402852.18N 0003456.88W | 1924 | 200 |
P23-0058-VA5-05 | 402740.86N 0003436.13W | 1971 | 200 |
P23-0058-VA5-06 | 402723.95N 0003433.85W | 1971 | 200 |
P23-0058-VA5-07 | 402703.92N 0003403.71W | 1988 | 200 |
Mobile crane | - | - | 140 |