FIR MADRID.- Cortijo Nuevo Wind Farm under construction.

Until 03 September 2027 (estimated), two wind turbines will be under construction at Cortijo Nuevo Wind Farm, in the municipality of Villanueva de San Juan (Sevilla).

For its construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0278-CN01-Windmill

370356.85N 0051240.62W

793

190

P23-0278-CN02-Windmill

370418.30N 0051152.85W

783

189

Mobile crane

-

-

130