AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 105/24

AIRAC 30-MAY-24

EFFECTIVE DATE WEF 11-JUL-24

AD / ENR

SUP 105/24

11JUL24/11JUL25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

Algeciras HLP (LEAG).- El Patrón Wind Farm under construction.

Until 11 July 2025 (estimated), four wind turbines will be under construction at El Patrón Wind Farm, in the municipality of Los Barrios (Cádiz).

For this construction the use of mobile cranes will be necessary.

The projected height, elevation and location of each element are detailed in the table below.

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0176 EP-01 Windmill

361318.89N 0052742.01W

302

200

P23-0176 EP-02 Windmill

361332.19N 0052737.47W

322

200

P23-0176 EP-03 Windmill

361345.86N 0052739.98W

351

200

P23-0176 EP-04 Windmill

361359.46N 0052744.37W

351

200

P23-0176 GM-1 Mobile crane

-

-

145

P23-0176 GM-2 Mobile crane

-

-

145

P23-0176 GM-3 Mobile crane

-

-

145

P23-0176 GM-4 Mobile crane

-

-

145