ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 106/24
AIRAC 30-MAY-24
EFFECTIVE DATE WEF 11-JUL-24
ENR
SUP 106/24
11JUL24/11JUL25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
FIR MADRID.- Installation of a measuring tower within Tierra de Campos 3 Wind Farm.
Until 11 July 2025 (estimated), a meteorological measurement tower will be under construction at “Tierra de Campos 3 (TCA3)” Wind Farm, in the municipality of San Román de la Cuba (Palencia).
The projected height, elevation and location is detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0240 TM Torre | 421652.19N 0045357.44W | 981 | 122 |
SUP 106/24