ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 108/24
AIRAC 30-MAY-24
EFFECTIVE DATE WEF 11-JUL-24
ENR
SUP 108/24
11JUL24/11JUL25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 11 July 2025 (estimated), two meteorological towers will be under construction at Cerrato VI Wind Farm, in the municipalities of Quintanilla de Trigueros and Trigueros del Valle (Valladolid).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Meteorological tower TR1 | 415137.12N 0044135.76W | 969 | 113 |
Meteorological tower TR2 | 415221.02N 0044119.91W | 970 | 113 |
Mobile crane | - | 150 |