SUP 109/24
AIRAC 30-MAY-24
EFFECTIVE DATE WEF 11-JUL-24
ENR
SUP 109/24
11JUL24/11JUL25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 11 July 2025 (estimated), two wind turbines will be under construction at Cerro Cabello Wind Farm, in the municipality of Los Barrios (Cádiz).
For their construction, the installation of two mobile cranes will be necessarye.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0175 CC-01 | 361241.32N 0052732.19W | 317 | 200 |
P23-0175 CC-02 | 361256.10N 0052752.03W | 312 | 200 |
P23-0175 GM-1 / Mobile crane 1 | - | - | 145 |
P23-0175 GM-2 / Mobile crane 2 | - | - | 145 |