SUP 111/24

AIRAC 30-MAY-24

EFFECTIVE DATE WEF 11-JUL-24

ENR

SUP 111/24

11JUL24/11JUL25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- La Mudarra Norte Wind Farm under construction.

Until 11 July 2025 (estimated), three wind turbines will be under construction at La Mudarra Norte Wind Farm, in the municipality of Mudarra (Valladolid).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0304 LAMN 01

414828.84N 0045855.21W

847

180

P23-0304  LAMN 02

414819.83N 0045843.62W

846

180

P23-0304  LAMN 03

414811.05N 0045832.21W

846

180

Mobile crane

-

-

160