SUP
118/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
118/24
AIRAC
27-JUN-24
EFFECTIVE DATE WEF
08-AUG-24
ENR
SUP
118/24
08AUG24/08AUG25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 08 August 2025 (estimated), three winds turbines and meteorological measurement tower will be under construction at San Roque wind farm, in the municipalities of Valpalmas and Luna (Zaragoza).
For their construction, the installation of five mobile cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COOR | ELEV (M AMSL) | HGT (M) |
P20-0234 SRQ-01 | 420730.79N 0005140.44W | 664 | 200 |
P20-0234 SRQ-02 | 420706.44N 0005145.66W | 664 | 200 |
P23-0357 SRQ-03 | 420632.50N 0005153.00W | 440 | 200 |
P20-0234 SRQ-TMP | 420720.35N 0005152.64W | 575 | 135 |
Mobile crane | - | - | 155 |