Until 8 August 2025 (estimated), one measurement tower will be under construction at La Mota Wind Farm, in the municipality of Medina del Campo (Valladolid).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0399 TM La Mota | 412222.09N 0045526.57W | 924 | 140 |
P23-0399 Mobile crane | - | - | 155 |