ang="en">

AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 124/24

AIRAC 27-JUN-24

EFFECTIVE DATE WEF 

08-AUG-24

ENR

SUP 124/24

08AUG24/08AUG25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Jubera II Wind Farm under construction.

Until 08 August 2025 (estimated), five wind turbines and a measurement tower will be under construction at Jubera II Wind Farm, in the municipality of Santa Engracia del Jubera (La Rioja).

For its construction, the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P22-0165 JUBII-01 Windmill

422052.66N 0021647.95W

591

190

P22-0165 JUBII-02 Windmill

422033.00N 0021640.88W

605

190

P22-0165 JUBII-03 Windmill

422014.59N 0021617.14W

625

190

P22-0165 JUBII-04 Windmill

422040.92N 0021607.92W

611

190

P22-0165 JUBII-05 Windmill

422027.24N 0021537.14W

636

190

P22-0165 Mobile crane

-

-

135