SUP
146/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
146/24
AIRAC
22-AUG-24
EFFECTIVE DATE WEF
03-OCT-24
ENR
SUP
146/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 3 October 2025 (estimated), five wind turbines and one meteorological tower will be under construction at the STEV Wind Farm, in the municipality of Zaragoza.
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the attached table.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0229 STE-01 Windmill | 413204.87N 0043463.36W | 512 | 182 |
P20-0229 STE-05 Windmill | 413119.98N 0043226.67W | 567 | 182 |
P20-0229 STE-06 Windmill | 413118.52N 0043358.34W | 550 | 182 |
P20-0229 STE-07 Windmill | 413106.46N 0043506.22W | 548 | 182 |
P20-0229 STE-09 Windmill | 413153.20N 0043139.50W | 512 | 182 |
P20-0229 STE-TP Meteorological tower | 413132.53N 0044021.80W | 482 | 101 |
P20-0229 STE-GRUA Mobile crane | - | - | 115 |