SUP
147/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
147/24
AIRAC
22-AUG-24
EFFECTIVE DATE WEF
03-OCT-24
ENR
SUP
147/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 03 October 2025 (estimated), nine wind turbines will be under construction at Dama de Baza, in the municipality of Huéneja (Granada).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT(M) |
P23-0291 DB01 windmill | 371350.57N 0025415.94W | 1385 | 180 |
P23-0291 DB03 windmill | 371335.67N 0025420.09W | 1368 | 180 |
P23-0291 DB05 windmill | 371320.00N 0025426.36W | 1346 | 180 |
P23-0291 DB07 windmill | 371301.06N 0025424.56W | 1320 | 180 |
P23-0291 DB11 windmill | 371306.88N 0025324.90W | 1354 | 180 |
P23-0291 DB13 windmill | 371408.91N 0025240.98W | 1485 | 180 |
P23-0291 DB15 windmill | 371352.73N 0025247.62W | 1442 | 180 |
P23-0291 DB17 windmill | 371338.56N 0025257.87W | 1423 | 180 |
P23-0291 DB19 windmill | 371320.84N 0025300.29W | 1385 | 180 |
P23-0291 movil crane | - | - | 180 |