Until 03 October 2025 (estimated), Aciberos wind farm will be under construction, in the municipality of Lubián (Zamora).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0243 AE1 | 420325.60N 0065149.77W | 1688.20 | 182.20 |
P23-0243 AE2 | 420333.39N 0065122.75W | 1754.20 | 182.20 |
P23-0243 AE3 | 420311.75N 0065139.31W | 1731.20 | 182.20 |
P23-0243 AE4 | 420316.93N 0065117.91W | 1787.00 | 182.00 |
P23-0243 AE5 | 420257.63N 0065138.31W | 1715.20 | 182.20 |
P23-0243 AE6 | 420301.34N 0065114.43W | 1761.20 | 182.20 |
P23-0243 AE7 | 420244.58N 0065119.74W | 1726.20 | 182.20 |