SUP
159/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
159/24
AIRAC
22-AUG-24
EFFECTIVE DATE WEF
03-OCT-24
ENR
SUP
159/24
03OCT24/03OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 03 October 2025 (estimated), Padornelo 3 wind farm will be under construction, in the municipality of Lubián (Zamora).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0244 AE1 | 420107.55N 0065045.91W | 1816.20 | 182.20 |
P23-0244 AE2 | 420114.20N 0065019.95W | 1779.20 | 182.20 |
P23-0244 AE3 | 420116.00N 0064951.62W | 1738.20 | 182.20 |
P23-0244 AE4 | 420124.64N 0064923.42W | 1748.00 | 182.00 |