AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

166/24

AIRAC 

19-SEP-24

EFFECTIVE DATE WEF 

31-OCT-24

ENR


SUP 

166/24

31OCT24/31OCT25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- El Oliado Wind Farm under construction.

Until 31 October 2025 (estimated), three wind turbines will be under construction at the El Oliado Wind Farm, in the municipality of Sesma (Navarra).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0155 OLI_1 Windmill

422711.16N 0020620.66W

644

200

P23-0155 OLI_2 Windmill

422640.34N 0020650.48W

640

200

P23-0155 OLI_3 Windmill

422621.41N 0020707.86W

607

200

P23-0155 Mobile crane

138