AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

173/24

AIRAC 

19-SEP-24

EFFECTIVE DATE WEF 

31-OCT-24

ENR

CANCEL: SUP 70/24

SUP 

173/24

31OCT24/31OCT25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Mareas I Wind Farm under construction.

Until 31 October 2025 (estimated), nine winds turbines and one measurement tower will be under construction at Mareas I wind farm, in the municipality of Mequinenza (Zaragoza).

For its construction the installation of four mobile cranes will be necessary.

The projected height, elevation and location of each element, which will be duly marked and lit, are detailed in the table below.

ID

COORD

ELEV (M AMSL)

HGT (M)

P24-0202 MR1_01 Windmill

411806.88N 0001443.80W

627

190

P24-0202 MR1_02 Windmill

411820.06N 0001503.58W

619

190

P24-0202 MR1_03 Windmill

411839.28N 0001457.79W

610

190

P24-0202 MR1_04 Windmill

411857.89N 0001500.62W

598

190

P24-0202 MR1_05 Windmill

411911.93N 0001514.22W

591

190

P24-0202 MR1_06 Windmill

411824.83N 0001327.75W

622

190

P24-0202 MR1_07 Windmill

411842.14N 0001334.67W

609

190

P24-0202 MR1_08 Windmill

411839.12N 0001224.49W

609

190

P24-0202 MR1_09 Windmill

411910.96N 0001225.93W

591

190

P24-0202 MR1_TM Tower

411850.89N 0001217.84W

518

108

P24-0202_1 Mobile crane

_

_

150

P24-0202_2 Mobile crane

_

_

150

P24-0202_3 Mobile crane

_

_

120

P24-0202_4 Mobile crane

_

_

120