SUP
173/24
31OCT24/31OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
173/24
AIRAC
19-SEP-24
EFFECTIVE DATE WEF
31-OCT-24
ENR
CANCEL: SUP 70/24
SUP
173/24
31OCT24/31OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 31 October 2025 (estimated), nine winds turbines and one measurement tower will be under construction at Mareas I wind farm, in the municipality of Mequinenza (Zaragoza).
For its construction the installation of four mobile cranes will be necessary.
The projected height, elevation and location of each element, which will be duly marked and lit, are detailed in the table below.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0202 MR1_01 Windmill | 411806.88N 0001443.80W | 627 | 190 |
P24-0202 MR1_02 Windmill | 411820.06N 0001503.58W | 619 | 190 |
P24-0202 MR1_03 Windmill | 411839.28N 0001457.79W | 610 | 190 |
P24-0202 MR1_04 Windmill | 411857.89N 0001500.62W | 598 | 190 |
P24-0202 MR1_05 Windmill | 411911.93N 0001514.22W | 591 | 190 |
P24-0202 MR1_06 Windmill | 411824.83N 0001327.75W | 622 | 190 |
P24-0202 MR1_07 Windmill | 411842.14N 0001334.67W | 609 | 190 |
P24-0202 MR1_08 Windmill | 411839.12N 0001224.49W | 609 | 190 |
P24-0202 MR1_09 Windmill | 411910.96N 0001225.93W | 591 | 190 |
P24-0202 MR1_TM Tower | 411850.89N 0001217.84W | 518 | 108 |
P24-0202_1 Mobile crane | _ | _ | 150 |
P24-0202_2 Mobile crane | _ | _ | 150 |
P24-0202_3 Mobile crane | _ | _ | 120 |
P24-0202_4 Mobile crane | _ | _ | 120 |