AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

177/24

AIRAC 

19-SEP-24

EFFECTIVE DATE WEF 

31-OCT-24

ENR

SUP 

177/24

31OCT24/31OCT25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Jerez Wind Farm under construction.

Until 31 October 2025 (estimated), one wind turbine will be under construction at Jerez Wind Farm, in the municipality of Jerez de la Frontera (Cádiz).

For its construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT(M)

P24-0319 WT-1 Windmill

364755.6N 0055813.7W

333

230

P23-0291 Mobile crane

-

-

200