SUP178/24
31OCT24/31OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
178/24
AIRAC
19-SEP-24
EFFECTIVE DATE WEF
31-OCT24
ENR
SUP178/24
31OCT24/31OCT25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 31 October 2025 (estimated), three wind turbines and one measurement tower will be under construction at “San Marcos II” Wind Farm, in the municipality of Larraga (Navarra).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:.
ID | COORD | COORD | ELEV (M AMSL) | HGT (M) |
1 (LIN05) | 423142.52 N | 0015533.68W | 682 | 186 |
2 (LIN06) | 423141.59N | 0015521.29W | 667 | 186 |
3 (LIN07) | 423144.27N | 0015509.54W | 648 | 186 |
Meteorological tower | 423146.08N | 0015455.05W | 552 | 112 |
Mobile crane | - | - | - | 125 |