AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

178/24

AIRAC 

19-SEP-24

EFFECTIVE DATE WEF 

31-OCT24

ENR

SUP178/24 

31OCT24/31OCT25EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- “San Marcos II” Wind Farm under construction.

Until 31 October 2025 (estimated), three wind turbines and one measurement tower will be under construction at “San Marcos II” Wind Farm, in the municipality of Larraga (Navarra).

 For its construction, the installation of a mobile crane will be necessary.

 The projected height, elevation and location of each element are detailed in the table below:.

ID

COORD

COORD

ELEV (M AMSL)

HGT (M)

1 (LIN05)

423142.52 N

0015533.68W

682

186

2 (LIN06)

423141.59N

0015521.29W

667

186

3 (LIN07)

423144.27N

  0015509.54W

648

186

Meteorological tower

423146.08N

  0015455.05W

552

112

Mobile crane

-

-

-

125