SUP
180/24
28NOV24/28NOV25
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
180/24
AIRAC
17-OCT-24
EFFECTIVE DATE WEF
28-NOV-24
ENR
CANCEL: SUP 146/24
SUP
180/24
28NOV24/28NOV25
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 28 November 2025 (estimated), five wind turbines and one meteorological tower will be under construction at the STEV Wind Farm, in the municipality of Zaragoza.
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the attached table.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0229 STE-01 Wind turbine | 413204.87N 0004346.34W | 512 | 182 |
P20-0229 STE-05 Wind turbine | 413119.98N 0004322.67W | 567 | 182 |
P20-0229 STE-06 Wind turbine | 413118.52N 0004335.83W | 550 | 182 |
P20-0229 STE-07 Wind turbine | 413106.46N 0004350.62W | 548 | 182 |
P20-0229 STE-09 Wind turbine | 413153.20N 0004313.95W | 512 | 182 |
P20-0229 STE-TP Meteorological tower | 413132.53N 0004402.18W | 482 | 101 |
P20-0229 STE-CRANE Mobile crane | - | - | 115 |