AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

180/24

AIRAC 

17-OCT-24

EFFECTIVE DATE WEF 

28-NOV-24

ENR

CANCEL: SUP 146/24

SUP 

180/24

28NOV24/28NOV25

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- STEV Wind Farm under construction, coordinates corrections.

Until 28 November 2025 (estimated), five wind turbines and one meteorological tower will be under construction at the STEV Wind Farm, in the municipality of Zaragoza.

For its construction, the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the attached table.

ID

COORD

ELEV (M AMSL)

HGT (M)

P20-0229 STE-01 Wind turbine

413204.87N 0004346.34W

512

182

P20-0229 STE-05 Wind turbine

413119.98N 0004322.67W

567

182

P20-0229 STE-06 Wind turbine

413118.52N 0004335.83W

550

182

P20-0229 STE-07 Wind turbine

413106.46N 0004350.62W

548

182

P20-0229 STE-09 Wind turbine

413153.20N 0004313.95W

512

182

P20-0229 STE-TP Meteorological tower

413132.53N 0004402.18W

482

101

P20-0229 STE-CRANE Mobile crane

-

-

115