Until 28 November 2025 (estimated), works to reconfigure the apron and expand the terminal will be carried out, consisting of:
Remodelling PRKG 03-05.
Expanding the West Zone of Module A (West Dock), remodelling PRKG 06-10.
Remodelling the north-east apron, remodelling PRKG 103 and 103B and remodelling roadways.
Stockpiling zone at PRKG 80.
The work will take place in twelve phases, the areas affected in each are those specified in the present document.
The phases might not necessarily be executed in the order defined, and several phases or subphases might be activated simultaneously.
The start and end dates of each phase, as well as any operational incident, will be by the corresponding NOTAM.
All phases of the works shall be duly marked and lit. Caution is recommended due to the presence of personnel and machinery.
The works will be performed at daytime or at night time. If any action affects any airport service or operations, the day and time slot will be coordinated in order to execute the works.
This phase includes blasting and painting works for the compliance of PRKG 03 and 04.
Operational Restrictions:
PRKG 03 and 04 closed.
PRKG 05 closed.
This phase includes blasting and painting works for the compliance of the new stands. The details for each reconfigured parking stand and the final layout of this zone is given below.
STAND | RAMP | COORD | EXIT | MAX ACFT | APROAR NOSE TO | REMARKS |
02 | R3 | 393253.57N 0024323.17E | R | A321 | E | - |
03 | R3 | 393254.33N 0024324.78E | R | A321 | E | - |
04 | R3 | 393255.09N 0024326.39E | R | A321 | E | - |
PRKG 06 and 08 closed.
PRKG 10 closed.
This phase includes blasting works for the compliance of Stand 10 and deviation of the roadway. Painting works will also be carried out.
Once the works have been completed, the configuration of the new Stand 10 will be as follows:
STAND | RAMP | COORD | EXIT | MAX ACFT | APROAR NOSE TO | REMARKS |
10 | R4 | 393259.53N 0024336.42E | R | B73MX | E | 400 Hz – A/C (5) |
(5) Visual docking guidance system.
This phase includes blasting works for the compliance of PRKG 08 and deviation of the roadway. Painting works will also be carried out.
Once the works have been completed, the configuration of the new PRKG 08 will be as follows:
STAND | RAMP | COORD | EXIT | MAX ACFT | APROAR NOSE TO | REMARKS |
08 | R4 | 393258.81N 0024334.59E | R | B73MX | E | 400 Hz – A/C (5) |
(5) Visual docking guidance system.
This phase includes blasting works for the compliance of the new PRKG 06A, 06 and 06B. Painting works will also be carried out.
Once the works have been completed, the configuration of the parking stands will be as follows:
STAND | RAMP | COORD | EXIT | MAX ACFT | APROAR NOSE TO | REMARKS |
06 | R3 | 393256.60N 0024331.99E | R | A35K | E | 400 Hz – A/C (5) INCOMP. 06A, 06B |
06A | R3 | 393256.88N 0024331.46E | R | B73MX | E | 400 Hz – A/C (5) INCOMP. 06 |
06B | R3 | 393258.03N 0024332.73E | R | B73MX | E | 400 Hz – A/C (5) INCOMP. 06 |
(5) Visual docking guidance system.
PRKG 06A/ 06B: (N3, N2, N1 or end of runway, TWY NORTH, GATE D and TWY LD).
PRKG 06A /06B: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.
PRKG 06A/06B: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE D and TWY LD).
PRKG 06A/06B: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2).
In this phase, the paint of the current roadways crossing the ground and the perimeter roadways around PRKG 103 and 102 will be blasted off. The new roadways (reconfigured roadways) will also be painted. All actions will be coordinated with the airport and work areas will be outlined with markings and lighting.
Gate D closed.
TWY LD and LE between PK102 and PEI LE1 closed
PRKG 102, 103-103B, 104, 105 closed
PRKG 05 closed
PRKG 06 to 12 closed
PRKG 103 and 103B closed
Blasting and painting works to reconfigure PRKG 103 and 103B.
Once the works have been completed, the configuration of the parking stands will be as follows:
STAND | RAMP | COORD | EXIT | MAX ACFT | APROAR NOSE TO | REMARKS |
103 | R3 | 393302.77N 0024327.63E | R | A339 | E | INCOMP. 103B |
103B | R3 | 393301.08N 0024327.68E | R | B73MX | E | INCOMP. 103 |
The modified standard routes are as follows:
PRKG 103: (N3, N2, N1 or end of runway, TWY NORTH, GATE C and TWY LD).
PRKG 103: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.
PRKG 103: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE C and TWY LD).
PRKG 103: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2)
PRKG 103B: (N3, N2, N1 or end of runway, TWY NORTH, GATE D).
PRKG 103B: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.
PRKG 103B: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE D).
PRKG 103B: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2)
PRKG 80 closed