PALMA DE MALLORCA AD (LEPA/LESJ).- Works to expand Module A and remodel the Terminal and reconfigure aircraft stands in front of the new RFFS North.

Until 28 November 2025 (estimated), works to reconfigure the apron and expand the terminal will be carried out, consisting of:

  • Remodelling PRKG 03-05.

  • Expanding the West Zone of Module A (West Dock), remodelling PRKG 06-10.

  • Remodelling the north-east apron, remodelling PRKG 103 and 103B and remodelling roadways.

  • Stockpiling zone at PRKG 80.

The work will take place in twelve phases, the areas affected in each are those specified in the present document.

The phases might not necessarily be executed in the order defined, and several phases or subphases might be activated simultaneously.

The start and end dates of each phase, as well as any operational incident, will be by the corresponding NOTAM.

All phases of the works shall be duly marked and lit. Caution is recommended due to the presence of personnel and machinery.

The works will be performed at daytime or at night time. If any action affects any airport service or operations, the day and time slot will be coordinated in order to execute the works.

PHASE 1

PRKG 03 AND 04 CLOSED

This phase includes blasting and painting works for the compliance of PRKG 03 and 04.

Operational Restrictions:

  • PRKG 03 and 04 closed.

PHASE 2

PRKG 05 CLOSED

Operational Restrictions:

  • PRKG 05 closed.

PHASE 3

RECONFIGURATION OF PRKG 02, 03 AND 04

This phase includes blasting and painting works for the compliance of the new stands. The details for each reconfigured parking stand and the final layout of this zone is given below.

STAND

RAMP

COORD

EXIT

MAX ACFT

APROAR NOSE TO

REMARKS

02

R3

393253.57N 0024323.17E

R

A321

E

-

03

R3

393254.33N 0024324.78E

R

A321

E

-

04

R3

393255.09N 0024326.39E

R

A321

E

-

Withdrawal of PRKG 5.

PHASE 4

CIERRE DEL PRKG 06 Y 08

Restricciones operativas:

  • PRKG 06 and 08 closed.

PHASE 5

PRKG 10 CLOSED

Operational Restrictions:

  • PRKG 10 closed.

PHASE 6

RECONFIGURATION OF PRKG 10 (NEW PRKG 10)

This phase includes blasting works for the compliance of Stand 10 and deviation of the roadway. Painting works will also be carried out.
Once the works have been completed, the configuration of the new Stand 10 will be as follows:

STAND

RAMP

COORD

EXIT

MAX ACFT

APROAR NOSE TO

REMARKS

10

R4

393259.53N 0024336.42E

R

B73MX

E

400 Hz – A/C (5)

(5) Visual docking guidance system.

PHASE 7

RECONFIGURATION OF PRKG 08 (NEW PRKG 08)

This phase includes blasting works for the compliance of PRKG 08 and deviation of the roadway. Painting works will also be carried out.

Once the works have been completed, the configuration of the new PRKG 08 will be as follows:

STAND

RAMP

COORD

EXIT

MAX ACFT

APROAR NOSE TO

REMARKS

08

R4

393258.81N 0024334.59E

R

B73MX

E

400 Hz – A/C (5)

(5) Visual docking guidance system.

PHASE 8

RECONFIGURATION OF PRKG 06 (NEW PRKG 06A, 06, 06B)

This phase includes blasting works for the compliance of the new PRKG 06A, 06 and 06B. Painting works will also be carried out.

Once the works have been completed, the configuration of the parking stands will be as follows:

STAND

RAMP

COORD

EXIT

MAX ACFT

APROAR NOSE TO

REMARKS

06

R3

393256.60N 0024331.99E

R

A35K

E

400 Hz – A/C (5)

INCOMP. 06A, 06B

06A

R3

393256.88N 0024331.46E

R

B73MX

E

400 Hz – A/C (5)

INCOMP. 06

06B

R3

393258.03N 0024332.73E

R

B73MX

E

400 Hz – A/C (5)

INCOMP. 06

(5) Visual docking guidance system.

The modified standard routes are as follows:

Arrivals on RWY 06L:

  • PRKG 06A/ 06B: (N3, N2, N1 or end of runway, TWY NORTH, GATE D and TWY LD).

Departures on RWY 06R:

  • PRKG 06A /06B: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.

Arrivals on RWY 24L:

  • PRKG 06A/06B: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE D and TWY LD).

Departures on RWY 24R:

  • PRKG 06A/06B: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2).

PHASE 9

NORTH-WEST APRON - ROADWAY RECONFIGURATION AND PAINTING ON APRON

In this phase, the paint of the current roadways crossing the ground and the perimeter roadways around PRKG 103 and 102 will be blasted off. The new roadways (reconfigured roadways) will also be painted. All actions will be coordinated with the airport and work areas will be outlined with markings and lighting.

Operational Restrictions:

  • Gate D closed.

  • TWY LD and LE between PK102 and PEI LE1 closed

  • PRKG 102, 103-103B, 104, 105 closed

  • PRKG 05 closed

  • PRKG 06 to 12 closed

FASE 10

PRKG 103 AND 103B CLOSED

Operational Restrictions:

  • PRKG 103 and 103B closed

FASE 11

NORTH-WEST APRON - RECONFIGURATION OF PRKG 103 AND 103B

Blasting and painting works to reconfigure PRKG 103 and 103B.

Once the works have been completed, the configuration of the parking stands will be as follows:

STAND

RAMP

COORD

EXIT

MAX ACFT

APROAR NOSE TO

REMARKS

103

R3

393302.77N

0024327.63E

R

A339

E

INCOMP. 103B

103B

R3

393301.08N 0024327.68E

R

B73MX

E

INCOMP. 103

The modified standard routes are as follows:

103:

Arrivals on RWY 06L:

  • PRKG 103: (N3, N2, N1 or end of runway, TWY NORTH, GATE C and TWY LD).

Departures on RWY 06R:

  • PRKG 103: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.

Arrivals on RWY 24L:

  • PRKG 103: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE C and TWY LD).

Departures on RWY 24R:

  • PRKG 103: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2)

103B:

Arrivals on RWY 06L:

  • PRKG 103B: (N3, N2, N1 or end of runway, TWY NORTH, GATE D).

Departures on RWY 06R:

  • PRKG 103B: TWY LD...LF, GATE F, LINK and SOUTH, runway-holding positions H6, H7 or H8.

Arrivals on RWY 24L:

  • PRKG 103B: (S1, TWY LINK and NORTH or S2, S3 or end of runway, TWY SOUTH, LINK and NORTH, GATE D).

Departures on RWY 24R:

  • PRKG 103B: (TWY LD…LF, GATE F, LINK and NORTH, runway-holding positions H1 or H2)

PHASE 12

WORKS ON EAST OF TERMINAL - CLOSURE PRKG 80

Operational Restrictions:

  • PRKG 80 closed