SUP
193/24
26DEC24/26DEC25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
193/24
AIRAC
14-NOV-24
EFFECTIVE DATE WEF
26-DEC-24
ENR
SUP
193/24
26DEC24/26DEC25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 26 December 2025 (estimated), one wind turbine will be under construction at La Ese wind farm, in the municipality of Tarifa (Cádiz).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
Windmill 1 | 360227.81N 0053410.76W | 245 | 101 |
Mobile crane | 360227.81N 0053410.76W | 255 | 111 |