Until 26 December 2025 (estimated), eleven wind turbines will be under construction at “Mondigo” Wind Farm in the municipalities of Ribadeo and Trabada (Lugo).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
A-01 | 432722.09N 0070816.56W | 569 | 150 |
A-02 | 432740.43N 0070814.08W | 619 | 150 |
A-03 | 432753.59N 0070811.90W | 632 | 150 |
A-04 | 432756.96N 0070830.17W | 575 | 150 |
A-06 | 432830.21N 0070825.68W | 563 | 150 |
A-07 | 432837.62N 0070900.62W | 578 | 150 |
A-08 | 432859.27N 0070906.68W | 538 | 150 |
A-09 | 432729.30N 0071052.12W | 568 | 150 |
A-10 | 432729.82N 0071111.02W | 623 | 150 |
A-11 | 432737.43N 0071122.45W | 633 | 150 |
A-12 | 432747.29N 0071129.37W | 630 | 150 |
Mobile crane | - | - | 120 |