SUP
202/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
202/24
AIRAC
12-DEC-24
EFFECTIVE DATE WEF
23-JAN-25
ENR
SUP
202/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 23 January 2026 (estimated), eight wind turbines will be under construction at Rueda Sur Wind 1 Wind Farm, in the municipality of Épila (Zaragoza).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0197 RSW1_01 Wind turbine | 413803.45N 0012336.07W | 662 | 230 |
P22-0197 RSW1_02 Wind turbine | 413656.65N 0012311.18W | 646 | 230 |
P22-0197 RSW1_03 Wind turbine | 413613.32N 0012257.85W | 647 | 230 |
P22-0197 RSW1_04 Wind turbine | 413627.66N 0012224.09W | 621 | 230 |
P22-0197 RSW1_05 Wind turbine | 413656.25N 0012241.65W | 630 | 230 |
P22-0197 RSW1_06 Wind turbine | 413736.83N 0012146.01W | 611 | 230 |
P22-0197 RSW1_07 Wind turbine | 413708.53N 0012132.60W | 608 | 230 |
P22-0197 RSW1_08 Wind turbine | 413739.35N 0012059.84W | 590 | 230 |
P22-0197 Mobile crane | - | - | 200 |