AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

207/24

AIRAC 

12-DEC-24

EFFECTIVE DATE WEF 

23-JAN-25

ENR

SUP 

207/24

23JAN25/23JAN26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA .- “Les Colladetes” wind farm under construction.

Until 23 January 2026 (estimated), nine wind turbines will be under installation at the “Les Colladetes” wind farm, in the municipality of El Perelló (Tarragona).

For its installation, the installation of a mobile crane will be necessary.

Every wind farm shall be dully marked and lit.

The projected height, elevation and location of each element are detailed in the attached table.

ID

COORD

ELEV (M AMSL)

HGT (M)

CLL01 Wind turbine

405317.76N 0004101.86E

490

209

CLL02 Wind turbine

405335.34N 0004105.19E

477

209

CLL03 Wind turbine

405345.53N 0004120.51E

512

209

CLL04 Wind turbine

405401.52N 0004125.42E

502

209

CLL05 Wind turbine

405411.88N 0004134.55E

475

209

CLL06 Wind turbine

405423.87N 0004145.20E

491

209

CLL07 Wind turbine

405459.07N 0004047.98E

474

209

CLL08 Wind turbine

405509.02N 0004107.00E

495

209

CLL09 Wind turbine

405514.88N 0004123.04E

527

209

Mobile crane

-

-

150