SUP
207/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
207/24
AIRAC
12-DEC-24
EFFECTIVE DATE WEF
23-JAN-25
ENR
SUP
207/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 23 January 2026 (estimated), nine wind turbines will be under installation at the “Les Colladetes” wind farm, in the municipality of El Perelló (Tarragona).
For its installation, the installation of a mobile crane will be necessary.
Every wind farm shall be dully marked and lit.
The projected height, elevation and location of each element are detailed in the attached table.
ID | COORD | ELEV (M AMSL) | HGT (M) |
CLL01 Wind turbine | 405317.76N 0004101.86E | 490 | 209 |
CLL02 Wind turbine | 405335.34N 0004105.19E | 477 | 209 |
CLL03 Wind turbine | 405345.53N 0004120.51E | 512 | 209 |
CLL04 Wind turbine | 405401.52N 0004125.42E | 502 | 209 |
CLL05 Wind turbine | 405411.88N 0004134.55E | 475 | 209 |
CLL06 Wind turbine | 405423.87N 0004145.20E | 491 | 209 |
CLL07 Wind turbine | 405459.07N 0004047.98E | 474 | 209 |
CLL08 Wind turbine | 405509.02N 0004107.00E | 495 | 209 |
CLL09 Wind turbine | 405514.88N 0004123.04E | 527 | 209 |
Mobile crane | - | - | 150 |