SUP
208/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
208/24
AIRAC
12-DEC-24
EFFECTIVE DATE WEF
23-JAN-25
ENR
SUP
208/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 23 January 2026 (estimated), four wind turbines will be under installation at the “Les Colladetes Ampliación” Wind Farm in the municipality of El Perelló (Tarragona).
For its installaltion, the installation of a mobile crane will be necessary.
Every wind turbine shall be dully marked and lit.
The projected height, elevation and location of each element are detailed in the attached table.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P22-0194 AC01 Wind turbine | 405349.78N 0004036.98E | 485 | 209 |
P22-0194 AC02 Wind turbine | 405411.44N 0004054.60E | 457 | 209 |
P22-0194 AC03 Wind turbine | 405428.30N 0004054.83E | 460 | 209 |
P22-0194 AC04 Wind turbine | 405426.12N 0004118.58E | 472 | 209 |
Mobile crane | - | - | 150 |