SUP
209/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
209/24
AIRAC
12-DEC-24
EFFECTIVE DATE WEF
23-JAN-25
ENR
SUP
209/24
23JAN25/23JAN26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 23 Jaunary 2026 (estimated), a two measurement towers will be installed at Aldeavieja Wind Farm, in the municipalities of Santa María del Cubillo y de Ojos-Albos (Ávila).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
CalMM_WTG2_1_JAT | 404306.91N 0042823.48W | 1689 | 122 |
TMM_02_2_JAT | 404311.37N 0042837.34W | 1665 | 122 |