ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 82/24
AIRAC 02-MAY-24
EFFECTIVE DATE WEF 13-JUN-24
ENR
SUP 82/24
13JUN24/13JUN25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 13 June 2025 (estimated), a measurement tower will be under construction at “El Valle” Wind Farm, in the municipality of Torquemada (Palencia).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0420 TM Tower | 420239.74N 0042025.28W | 958 | 142 |
P23-0420 Mobile crane | - | - | 155 |
SUP 82/24