AIS-ESPAÑA
Dirección AFTN: LEANZXTA
Teléfono: +34 913 213 363
E-mail: ais@enaire.es
Web: www.enaire.es
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 88/24
AIRAC 02-MAY-24
EFFECTIVE DATE WEF 13-JUN-24
ENR
SUP 88/24
13JUN24/13JUN25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 13 June 2025 (estimated), eight windmill and one measuring tower will be under construction at Cascante II wind farm, in municipality of Cascante (Navarra).
For its construction the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID |
COORD |
ELEV (M AMSL) |
HGT (M) |
P18-0363 AG 01 |
415939.43N 0014225.93W |
675 |
200 |
P18-0363 AG 04 |
415912.27N 001431.08W |
700 |
200 |
P18-0363 AG 05 |
415918.70N 0014325.75W |
700 |
200 |
P18-0363 AG 06 |
415847.90N 0014349.66W |
718 |
200 |
P18-0363 AG 07 |
415837.59N 0014413.64W |
712 |
200 |
P21-0637 AG 01 |
415931.87N 0014242.81W |
685 |
200 |
P21-0637 AG 02 |
415923.25N 0014257.72W |
696 |
200 |
P23-0187 |
415827.86N 0014424.82W |
721 |
200 |
P23-0187 Tower |
415910.66N 0014335.00W |
557 |
120 |
Mobile crane |
- |
- |
180 |
SUP 88/24