ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 90/24
AIRAC 02-MAY-24
EFFECTIVE DATE WEF 13-JUN-24
ENR
SUP 90/24
13JUN24/13JUN25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 13 June 2025 (estimated), five wind turbines be under construction at Airas Wind Farm in the municipality of Alfoz (Lugo).
For their construction, the installation of five mobile cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0222-A01 | 435029.23N 0074331.33W | 629 | 180 |
P23-0222-A02 | 435003.36N 0074276.96W | 722 | 180 |
P23-0222-A03 | 434976.62N 0074250.56W | 756 | 180 |
P23-0222-A04 | 434955.63N 0074216.85W | 747 | 180 |
P23-0222-A05 | 435074.10N 0074188.90W | 627 | 180 |
P23-0222-A01-Mobile crane 1 | - | - | 150 |
P23-0222-A02-Mobile crane 2 | - | - | 150 |
P23-0222-A03-Mobile crane 3 | - | - | 150 |
P23-0222-A04-Mobile crane 4 | - | - | 150 |
P23-0222-A05-Mobile crane 5 | - | - | 150 |
SUP 90/24