ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP 98/24
AIRAC 30-MAY-24
EFFECTIVE DATE WEF 11-JUL-24
ENR
SUP 98/24
11JUL24/11JUL25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 11 July 2025 (estimated), one wind measurement tower will be under construction at Faro-Farelo Wind Farm, in the municipality of Agolada (Pontevedra).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0195 Measurement Tower | 427618.40N 0079600.80W | 916 | 121 |
P23-0195 Mobile crane | - | - | 121 |